Loading...
Request For Comment.doc .107.02 :WAS ROUTED F THE DATE THIS FORMTED WITHIN 15 DAYS OMENTS MUST BE SUBMITLL COMPER ECDC 20.02.005 A CITY OF EDMONDS – PLANNING DIVISION COMMENT FORM  PW- EngineeringFirePW - Maintenance Parks & Rec. Building  Economic Dev. Parks Maintenance **PLANS & MATERIALS ARE UNDER PLAN20140070** Project Number: PLN20140070 & PLN20140071 Applicant’s Name: PORT OF EDMONDS Property Location: 100 block & 300 block of Admiral Way Date of Application: Date Form Routed: 12.15.14 12.17.14 Zoning: COMMERCIAL WATERFRONT (CW) Project Description: PLN20140070 – Shoreline Permit & PLN20140071 – Design Review Construct new bathroom facilities & remodel existing bathroom facilities **PER ECDC 20.02.005 ALL COMMENTS MUST BE SUBMITTED WITHIN 15 DAYS OF THE DATE : THIS FORM WAS ROUTEDDUE BY 1/09/2015 If you have any questions or need clarification on this project, please contact: Responsible Staff: Ext. KERNEN LIEN1223 ************************************************************************************************************** Name of Individual Submitting Comments: Title:   I have reviewed this land use proposal I have reviewed this land use proposal for my department and have for my department and have IT WOULD NOT AFFECT IT WOULD AFFECT MY concluded that concluded that MY DEPARTMENTDEPARTMENT , so I have no , so I have provided comments. My department may also comments or conditions below or attached. review this project during the building permit process (if applicable) and reserves the right to provide additional comments at that time. Comments (please attach memo if additional space is needed): The following conditions should be attached to this permit to ensure compliance with the requirements of this department (please attach memo if additional space is needed): Date: Signature: Phone/E-mail: