Loading...
RequestForInfo_06-09-09.pdf CITY OF EDMONDS th 121 5 Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION June 9, 2009 Shane DeBoer and Heidi Thorstenson 17717 Talbot Road Edmonds WA 98026 SUBJECT: Request for additional information to complete your pending Conditional Use permit (CU) for an Accessory Dwelling Unit (ADU), File # CU-2009-30. Dear Applicant: Thank you for submitting an application for a Conditional Use Permit (CU) for an Accessory Dwelling Unit (ADU) at 17717 Talbot Road in the Single-Family Residential (RS-20) zone. City staff has finished the initial check for completeness on your application, and it was found that the following information, clarification, or corrections will need to be addressed before review can continue. Please provide a written response to the items mentioned below… 1.Planning Division Comments: a. Please provide a scaled floor plan (1/4” = 1’) showing all rooms and spaces. Although the space is relatively small, I still need to confirm that there are no more than two bedrooms proposed. This can be hand-drawn if you’d like. b. Please fill out and return, along with the $155 review fee, the required Critical Areas Checklist (enclosed). I searched our permit database and was unable to locate one for your site. If there are streams, wetlands, or steep slopes found on or adjacent to your property, studies to evaluate the impact to potential critical areas may be required with future building permits. c. Thank you for submitting a draft ADU covenant. I will provide you with a final copy to sign before a notary public towards the end of the ADU process that you will be responsible for recording at the county. : 2.Building Division Comment (FYI) The Building Division wanted to let you know that a “building compliance permit” will be required after you receive ADU approval with this land use permit. I have attached a handout on the process. This is a required permit for those seeking ADU approval and goes hand-in-hand with the land use permit – it is a review of the proposed construction and includes a compliance inspection. 3.Fire Department Comment: (FYI) The Fire Department has provided the standard comment for ADUs – that smoke detectors, interconnected, hard wired with battery backup, will be required with your upcoming “building compliance permit.” Page 1 of 2 Please respond at your earliest convenience so that your application may be processed in an expedient manner. Thank you for your interest in land use and development in Edmonds. If you have any questions about the City’s application review process and/or the schedule for your application, please contact me at 425.771.0220, extension 1778. Sincerely, Gina Coccia Associate Planner cc: File CU-2009-30 enc: Handout on ADUs (#P1) Critical Areas Checklist (#P20) P.S. Please feel free to view the status of your permit and associated documents online: (1) Go to the City’s Quick Links ) and click on the tab “,” which will have a drop down menu website (www.ci.edmonds.wa.us Online Permit InformationSearch for Permit – click on “.” (2) Click on “” and (3) type in the complete PLN20090030 file number with no spaces or dashes (). Page 2 of 2