Loading...
Response 081412-eng20120263-OMT_Monitoring Wells-email_response.pdf From:John Bhend To:McConnell, Jeanie Subject:RE: eng20120263 - Old Milltown Monitoring Wells Date:Tuesday, August 14, 2012 2:50:59 PM Attachments:Old Milltown Property Proposed Site Plan (2).pdf Hi Jeanie, th The attached site plan has been revised to indicate the power line crossing from the west side of 5 to the east side. It looks like we will have enough clearance for the proposed monitoring well at that location. I also slightly moved a proposed monitoring well at the northeast corner of the intersection of th 5 Avenue and Maple Street to avoid a water line in that area. We will also be completing a private utility locate before the drilling starts for additional confirmation that the proposed drilling locations will be clear from underground utilities. Have you heard back yet from the Parks Manager? Feel free to contact me with any questions. Thanks, John Bhend, L.G. Adapt Engineering, Inc. Phone: (206) 654-7045 From: McConnell, Jeanie \[mailto:Mcconnell@ci.edmonds.wa.us\] Sent: Tuesday, August 07, 2012 2:40 PM To:John Bhend Subject: RE: eng20120263 - Old Milltown Monitoring Wells Hi John, I received your phone message … you have great timing! I had your project pulled for review today. Everything looks good except the power system isn’t shown completely (there is a crossing th from the west side of 5 to the east side that feeds the Hazel Miller Plaza). I’m a little concerned that the proposed well location falls in line with that crossing. Can you double check the locates (or call again if needed) to confirm location of this crossing. I also have a message out to our Parks Manager for information on the storm connection from the th Plaza to the CB at the corner of 5 and Maple. I need to make sure that that well isn’t in conflict with the storm line. Once those two pieces come together we should be good for permit issuance. I’ll let you know the permit fee at that time. Thanks, Jeanie From:John Bhend \[mailto:JohnBhend@adaptengr.com\] Sent: Wednesday, July 25, 2012 5:17 PM To: McConnell, Jeanie Subject: RE: eng20120263 - Old Milltown Monitoring Wells Hi Jeanie, I have attached a revised version of our updated site plan which indicates the locations of the proposed monitoring wells. My response to your questions is as follows: 1)See attached site plan which includes a detailed diagram of the well location and extent of disruption. a.Yes, the wells will be in the pavement section just outside the curb/gutter. th b.The well will be in the sidewalk at the intersection of 5 & Maple. th c.All of the proposed wells near 5 & Maple will be located within the sidewalk area and not in the landscape area. th 2)The stormwater mains and catch basins along 5 Avenue have been included on the site plan diagram. 3)A detail indicating the construction of the monitoring well monument cap and concrete seal (including dimensions) has been included on the site plan diagram. 4)The monitoring wells will be sampled on a quarterly basis (once every three months). A passenger vehicle (i.e., support vehicle) will be parked along the street in the area adjacent to where the monitoring wells will be located. A small peristaltic pump will be used to collect the water sample from the wells. The sampling equipment and personnel will require an area approximately three (3) feet by three (3) feet area around each well to complete the sampling activities. Please feel free to contact me with any additional questions or comments. Sincerely, John Bhend, L.G. Adapt Engineering, Inc. Phone: (206) 654-7045 From: McConnell, Jeanie \[mailto:Mcconnell@ci.edmonds.wa.us\] Sent: Tuesday, July 10, 2012 8:37 AM To:John Bhend Subject: eng20120263 - Old Milltown Monitoring Wells Good morning John, Please provide the following information/clarification regarding the ROW construction permit to install 6 groundwater monitoring wells in the vicinity of Old Milltown: 1)Please provide additional detail at each of the boring locations to indicate the extent of disruption and exact placement of the well. a.At street locations, will the wells be in the pavement section just outside the curb/gutter? th b.At the intersection of 5 & Maple will the well be in the sidewalk ramp or in the sidewalk? th c.Where in the landscape area near 5 & Maple do you propose well installation? The City just completed the Hazel Miller Plaza and exact location will need to be approved and then installation coordinated with the City Parks Department (I will assist with this). th 2)Show stormwater mains and catch basins along 5 Ave. 3)Please provide a detail of the monitoring well monument cap and concrete seal. Indicate diameter of each. 4)Provide proposed monitoring schedule (how many times a month/year will samples be taken) and indicate the type of equipment and setup needed to perform the samplings. Again, I appreciate your patience with getting through this review. I will keep this project a priority now until we get the permit issued. Thank you! Jeanie McConnell Engineering Program Manager #¨³¸ ®¥ Edmonds Ȟ 0´¡«¨¢ 7®±ª² Department th ΐΑΐ Δ !µ¤­´¤ .®±³§Ǿ Edmonds WA 98020 ΓΑΔȁΖΖΐȁΏΑΑΏ ·ΐΒΒΗ Ȟ www.edmondswa.gov ͗.¤µ¤± £®´¡³ ³§ ³   ²¬ «« ¦±®´¯ ®¥ ³§®´¦§³¥´«Ǿ ¢®¬¬¨³³¤£ ¢¨³¨¹¤­² ¢ ­ ¢§ ­¦¤ ³§¤ ¶®±«£ȁ )­£¤¤£Ǿ ¨³ ¨² ³§¤ ®­«¸ ³§¨­¦ ³§ ³ ¤µ¤± § ² ȁ͓ ȃ