Loading...
Response for Graphite ADB resubmittal.pdfProject: Graphite Art Studios #1 and #2 Address: 202 Main Street & 117 2nd Ave S PLN20190009 At the June 5, 2019 Phase 1 Design Review, there were a few issues and questions which we would like to address. 1. The use of Corten: a. Will it drip and leave stains? We have looked at the design and what is directly below the Corten panels. In most cases the bottom edge of the Corten panels was over landscaping or planter boxes which will prevent rust stains from occurring. In a few areas, there could have been an issue, so we have made changes to prevent this from happening. b. Is Corten OK for salty environments and fog? It turns out that there is a lot of literature on this subject as Corten has failed in some applications. There are two conditions where Corten can have problems: i. Corrosive Atmospheres: ISO has conducted a worldwide atmospheric exposure program known as ISO CORRAG and created a classification system for the effect of atmospheric corrosivity on various metals including steel and weathering steel which Corten is. Edmonds is in the second lowest corrosive category (see ISO map) with a corrosion rate of less than 1 mm over a 100 year period. E.*eMly ,severe Severe modeme MFId NeAiWe 1 ii. Salinity is another concern for Corten: Corten is not recommended in Subtropical locations or in Category S3 environments. Edmonds is a Category S1/S2 environment. FS1 3 < 60 Coastal Sz 60 < 300 Environment S3 300 < 1500 Within 200 m. of Sea 2. The clerestory window on the light tower Building #1 facing Main Street: It was suggested that these two windows should be the same size height rather than one taller than the other. This change has been made. 3. Awnings: Several questions and concerns were raised about the awnings. It was not clear from the drawings that the awnings will comply with the June 27, 2017 ADB Final Decision stated as a condition of approval as follows: "AWNINGS ON THE 2ND AVENUE AND MAIN STREET FACADES SHALL PROJECT A MINIMUM OF FOUR FEET FROM THE VERTICAL FACE OF THE BUILDING, VERTICAL FACE BEING EITHER THE BUILDING FACADE OR PLANTERS BELOW." The drawings now show this condition more clearly for the main building. Building #2 on 2nd Ave has considerably less length than Building #1, so a 3' wide awning is proposed as that will be more in scale with the building. 4. Corner Terrace at 2nd & Main Street: It was suggested that a transparent material might be used for the railing system of this terrace. This suggestion has been incorporated into the design. Additionally, the planter box has been reduced in height such that the transparent portion will be greater. 5. Elevation showing both buildings together along 2nd Ave: This is provided in the resubmittal package and will be available to view electronically at the Phase 2 ADB hearing. 6. Main Building, 2nd Ave Windows: It was suggested by ADB that the windows of the main building along 2" Ave extend lower to provide more visibility into the building from the sidewalk. This has been done. 7. Design Guidelines Checklist: Our comments are added to the checklist. 2