Loading...
RESPONSE LETTER.pdfLOUISE S. WRIGHT 11706 8th AVENUE, NW SEATTLE, WASHINGTON 98177 206.512.7444 louiseswright@gmail.com gmail.com DATE: December 20, 2016 TO: Kernen Lien, Senior Planner City of Edmonds, Development Services Department RE: Plan Check BLD20161422 1990 -89th Place West Single Family Residence Addition/ Remodel CORRECTION RESPONSE: � CA NNE D pr `'P 016 Enclosed you will find two copies of the plan sheets that have been revised to address the removal of the originally proposed entry deck that did not conform to the City of Edmonds Zoning Regulations for front yard setbacks. Because removal of the proposed deck necessitated relocating the entry door back to the existing location it triggered some other minor modifications to the plans. Following is a detailed list of the changes made to that plans that should satisfy the Correction #1 noted in your memo dated l l / 15/2016. Sheet Al: -Lot Coverage and Impervious Surface Calculations adjusted to show no change. -Total Fenestration increased by 20sf due to change in front door location and larger living room window. -Deck removed from site plan Sheet A2: -Electrical panel deleted (moved back upstairs) Sheet A3: -Deck removed, front door relocated to existing location, closets and living room window reconfigured, fireplace centered, refrigerator, pantry and island adjusted/ relocated, wall to right of range left intact, beam between the dining and living made flush, electrical panel relocated Ni�lll O�rt(PM¢ �D79fltu+uR ^ iWa Ub P VFW- Ind Crry Copy DEC 7, 1 2016 MEMO, page 2 Kernen Lien, Senior Planner Plan Check BLD20161422 19900 - 89th Place NE 12/20/2016 Sheet A4: -Section A - opening to living room widened, dropped beam at opening made flush -Section B - fireplace and shelving centered -Section C - kitchen pantry relocation shown as well as bracing in attic shown per detail CB, sheet S3 Sheet A5: -Fenestration Schedule adjusted to keep existing window # 1 and to provide a matching window in the living room Sheet A6: -North Elevation - existing electrical mast to remain, proposed deck removed and fireplace exhaust relocated to center of living room -East Elevation - deck removed, existing window # 1 to remain, window #2 adjusted, electrical meter and strike at existing location Sheet A7: -No Change Sheet A/ S 1: -Proposed entry deck removed, existing concrete walk and drive to remain Sheet A/ S2: -Living window widened, shear wall lengthened, beam (1-2) changed to lsl and made flush with the ceiling, existing entry door header called out as such Sheet S 1: -No Change Sheet S2: -No Change Sheet S3: -Detail CBB revised for flush 4x12 lsl and detail CB revised to address bearing condition as well Sheet S4: -No Change Thank you for your patience with this. I hope that you will call me with questions if you have them. I look forward to hearing from you. Louise Louise S. Wright, designer 11706 8th Avenue, NW Seattle, WA 98177 louiseswrigh a mail.com 206-512-7444