Loading...
Response to BLDG 1.pdfJune 19, 2018 Strobl Design Jacob Strobl PO Box 20764 Seattle, WA 98102 iacob@strobidesien.com (206) 661-3622 Eric Carter Plans Examiner City of Edmonds (425) 771-0220 Re: Plan Check: BLD20180739 Building Review Comments Dear Eric, RESUB JUN 15 2018 BUILDINGEDDNIIFMONS Please see the below responses to the correction notice dated June 12, 2018 for 21616 92"d Ave W, plan check number BLD20180739. Correction #1 It appears that a 2x4 wall is intended to separate the exercise and lower floor bath, with the exercise room directly communicating with the garage, which is "unconditioned" space. To meet the prescriptive requirements of the WSEC, R21 insulation is required and does not fit into a 2x4 wall. Please clarify and change on the plans. Response: See revised sheet A4 showing a 2x6 wall between the exercise room and lower floor bath. Exterior walls separating conditioned space from unconditioned space are called out to have R-21 insulation per sheet Al. rnrrar+inn #7 The man door at the garage is labeled as "20 minute fire door". This door will also require a self -closing device to the plans. Please add the note to the plans. Response: See revised sheet A4 noting the self -closing device on the 20 minute fire door. Correction #3 As indicated on page A5, detail 3/S1.1 is the intended construction for the piers supporting the steel columns. The supplied structural calculations do not appear to match the plans. The provided talcs appear to indicate a 20" x 20" base plate and the plans show a 16"x 1'4". Please clarify and address on the plans. Response: See attached response from the structural engineer. Correction #4 Detail 4/S1.1 indicates an installation of 5/8"x 18"A.B. Please clarify which type of A.B. is to be used on the plans. Response: See attached response from the structural engineer. Correction #5 For clarification, will the welding take place on -site or be fabricated off —site? If the welding is to take place on -site a Special Inspection Testing Agreement will need to filled out and returned prior to permit issuance. Please clarify. Response: Welding and fabrication will take place off -site. These items resolve the plan corrections for the project. Please let me know if you have any questions. Best Regards, Jacob Strobl Swenson Say Faget STRUCTURAL ENGINEERING 2124 Third Ave, Suite 100 Seattle, WA 98121 O 206.443.6212 934 Broadway, Suite 100 Tacoma, WA 98402 O 253.284.9470 CO. ssfengineers.com Memorandum To: Jaoob Strobl Dare: June 94. 2040 Address: Su,obl Design LLO From: Joanne Johnson P_O_ Box 20764 Seattle. WA. 9Q402 Projeor: Watwm Residenoe 94646 99'11 Ave U/_ Edmonds. WA. 9Q020 Plan OheoV- BLD204Q-0739 Jacob. We have reoeived and reviewed the suvotural oomments regarding the Wattum Residenoe looated at 24646 92"1 Ave W. in Edmonds. WA_ Below are the oorresponding responses to the stmotural oomments for building permit BLD204Q-0799 presented by Erio Oarter in the oorreotion notioe- 9uweruMal Review 3_ Detail 3.S44 and oaloulations have been revised for an 40" square base plate. 7_ Detail 4.S4_4 has been revised. Anohor bolts are per general struotural note #97 on SI.O. Please pall if we mar be of further assistanoe_ Sinoerel�t. SWEAISON SAV FAGET A Stwowral Engineering Oorporation Joanna Johnson. PE Project Engineer