Loading...
Response to BLDG 2 Comments.pdfRESUB APR 18 2018 To: Mr. Chuck Miller, Plans Examiner, chuck.miller@edmonmdswa-ML31NG DEPARTMENT BUILDING DIVISION City of Edmonds (425) 771-0220 CITY OF EDMONDS DATE: APRIL 12, 2018 From: King Lee / Monarch Trading Corporation / 948 S. Doris Street, Seattle, WA 98108 monarchtcorp@gmail.com RE: Correction response :- Plan Check: BLD2018-0152 — 2Id review Project Address: 21940 Highway 99, Suite B Project: Patty's Eggnest type I hood Scope: Install type I hood/makeup air for commercial kitchen — non separated IBC 303.1.1 B occupancy group — 49 occupants — VB construction - NFPA 13 fire sprinkler system — fire suppression system under separate permit Please Note that corrections have been made as indicated on corrected plan as clouded and numbered (10.a and 10.b) accordingly: - On sheet M2.0 — Hood Plan — Hood Elevation — Shaft / Wrap Detail: Corrections made as shown : 10. Side Elevation a. Clarify on the plans the indicated 'clearance reduction method' to be utilized for the installation of the 'Type P hood along the 'existing' wall constructed of combustible materials. The provision of an '18 inch insulation fire pad' does not appear to correspond with any of those listed in IMC Table 308.4.2. Alternatively, a wall framed with noncombustible materials and elements per IMC 507.2.6 may be installed in front of the 'existing' wall. b. Clarify on the plans the note "1 inch factory insulated for 0 clearance reduction to combustible". It does not appear to correspond with the information provided on sheet 'M3' - Hood Detail Plan - Clearance to Combustibles. • Additional plan reviewer note. The installation of a listed hood must comply with the requirements/allowances IMC 5071308, even with a 'clearance to combustibles' determined by testing of less than that found in the code. IMC 308.2 specifically limits the clearance reduction of required clearances tocombustibles to those appliances, equipment, and methods permitted in IMC Section 308. Response: A new Clearance reduction method is chosen from TABLE 308.4.2 Corrections are clouded on P.M2, M3. New pages with specification of reduction material and method are shown on spec pages CASUL710_Hood_insulation p.1 and page 2 as well as Spec 2 —Roxul RHT80 Please kindly review and approve accordingly, Thank you very much, Prepared by: King Lee /Monarch (206) 396-3173 Page 1 of 1