Loading...
Response to BLDG Comments 1.pdfRESUB SEP 0 1 2017 September 1 st, 2017 BUILDING DEPARTMENT CITY OF EDMONDS To: City of Edmonds, Development Services Attn: Chuck Miller Re: Building Division Review Project #BLDG20170970 Highland Park Condominiums: 550 Elm Way, Edmonds, WA. 98020 Mr. Miller, We have received your correction notice for the subject project, dated August 25th, 2017. Below is an itemized response to you corrections/ questions. 1. Constructions drawings have been stamped and signed by a licensed architect. 2. RCW 64.55 A. The building enclosure design documents (plans) have been stamped and signed by a licensed architect. Please also see the Building enclosure letter provided with the original plans submission. B. The special inspection form has been filled out and attached to this resubmission. I. Note: The Soltner Group Architects Inc. (SGA) as recognized building enclosure experts with over 30 years experience in evaluating, designing, and overseeing exterior envelope repairs will be performing the role of special inspector for the property at 500 Elm Way, Edmonds, Wa. SGA will perform periodic reviews of work in progress and final reviews of completed work as required to verify that rehabilitative construction on the project noted above has been performed in substantial compliance with the building enclosure design documents prepared by this firm. 3. Sheet A 1.0: Fire resistivity. A. The fastener length as part of the one hour rated fire resistive wall assembly has been changed (from 1-3/4" to 2-1 /4") to accommodate the thickness of the plywood sheathing as required. B. "Existing Heavy Timber Construction" has been removed from the fire resistivity notes. 4. Sheet A1.0: "Existing Heavy Timber Construction" has been removed from the construction type notes 5. Sheet A2.0: Callouts have been revised to reference the correct sheet numbers (2.5 has been changed to 2.2 and 2.6 has been changed to 2.3) SOLTNER GROUP architects a s 0 M M N 0 N W it OD N O W CYI co co 0 s 0 0 3 6. Sheet A2.2: Callouts have been revised to reference the correct sheet numbers (2.6 has been changed to 2.2) 7. Sheet A3.0: Callout has been corrected to read "1 8. Sheet A3.1- Unit Deck Repair Matrix: The notes for Units 102, 103, 104, 105, 106, 107, &109 have been revised to describe the scope and removed reference to sheet A3.4 9. Sheet A3.1- Detail 1: Note for purlin spacing has been revised to (64") OC 10. Sheet A3.1- Detail 2: Note for purlin spacing has been revised to (64") OC. Reference to specific Purlin sizing has been removed. 11. Sheet A3.1- Detail 3: Note for purlin spacing has been revised to (64") OC. 12. Sheet A3.2- Detail 5: Reference to specific Purlin sizing has been removed. 13. Sheet A3.3: Reference to specific Purlin spacing has been removed. 14. Sheet A3.5- Detail 7: Callouts have been changed from 3/- to 8/- & 4/- to 9/- 15. Sheet A3.5- Detail 10: Callouts for sheet A3.4 have been removed. Associated notes have been revised to clarify scope. 16. Sheet A3.7- Section 2: Callout has been removed. Other notes and callouts elsewhere on this section are applicable to this area and original callout was unnecessary. 17. Sheet A3.7- Detail 3: Blank callouts have been revised to reference details 5/(A)3.7 and 7/(A)3.7. 18. Sheet A3.7- Detail 6: Callout has been revised to read 1 /(A)3.0 19. Sheet A3.9: Callouts for sheet A3.4 have been removed. Associated notes have been revised to clarify scope. 20. Sheet A3.10: Callout has been changed to reference sheet A3.0 Items 21-23 to be addressed by engineer in attached response. On this date revised plan sheets with these changes have been resubmitted to Edmonds Development Services. All revisions are clouded and identified as Revision 1. We look forward to your expedient review and approval. Please let me know if you have any further questions or comments. Sincerely, George H. Singer Senior Architect DO DIBBLE ENGINEERS INC September 1, 2017 City of Edmonds Development Services Department Attn: Chuck Miller, Plans Examiner 121 511 Ave N Edmonds, WA 98020 Re: Highland Park Condominiums Repair 550 Elm Way, Edmonds, WA 98020 City of Edmonds Plan Check: BLD2017-0970 DEI Projcect:16-599 Dear Mr. Miller: This letter is intended to address comments raised by the City of Edmonds during the review of the Highland Park Condominiums Repair project, building 550. Specifically we will address comments regarding the structural sheets. Below you will find each comment, followed by a response from DEI. 21. Sheet S3.0 — Detail 11 — Typical Deck Beam Splice — Provide on the plans a 'general note', or reference where applicable, to the provided detail to guide its proper use, the work to be performed, and the inspection of the work. Additional notes have been added to details 11S3.0 & 11/S3.0 to clarify where the beam splice is to be used. 22. Sheet S3.1 — Detail 4 — Guardrail Corner Connection — Plan View — Provide on the plans a 'general note', or reference where applicable, to the provided detail to guide its proper use, the work to be performed, and the inspection of the work. A note has been added to the detail to clarify where the corner connection is to be used. Additionally, detail cuts have been added to sheets S2.2 & S2.3 which show typical locations where the corner connection is to be used. 23. Sheet S3.1 — Detail 7 — Typical Thru-Floor Connection at Flush Wall — Change on the plans the identified detail referenced as an alternative from '7/S3.0'to'l1/S3.1'. The note has been changed to reference 11/S3.1 as originally intended. Additionally, DEI believes that comment #23 for project BLD2017-0969 may have been intended for this project. Therefore, references to existing beam sizes have been removed from details 3/S3.0 and 4/S3.0 to avoid conflicts with existing conditions. DEI DIBBLE ENGINEERS INC Thank you for your comments. Please contact us with any questions or for clarifications, and we will be happy to assist. Sincerely, DIBBLE ENGINEERS, INC. John Mayfield, PE Project Manager ohn@dibbleengineers.com 17 PAGE 2 OF 2