Loading...
Response to BLDG comments 1.pdf�{ f � raw i Jf Date: January 4, 2017 To: Chuck Miller, Plans Examiners` From: Jonathan Madison (971) 404-7813, J.onathan.b.Mad'isorl@ rnail�om Re: Plan Check: BLD2016-1341 Project Address: 8413 220th Street SW Project: Accessory structure to SFR Scope: Construct detached accessory structure — R-3 detached U occupancy groups — V -B construction - sprinkler system not required— mechanical and plumbing not included. Please find the attached drawings, Resubmittal 1, for the Madison's hobby wood working shop. All items of concern have been addressed, as detailed below. 1. Page 2- Foundation Specifications- General Specifications. All footings are to be placed a minimum of 18" below undisturbed grade, to assure they remain below the frost line. This is also shown on the drawings, page 3 - Detail E. Page 3- Foundation Specifications- Reinforcing Specifications. All foundation reinforcement to be ASTM A615- Grade 60 Steel (Minimum). Conflicting statements on the drawings have been corrected. Page 3- Foundation Specifications- Details. Anchor bolts to be installed as follows: "1/2"x 10" ANCHOR BOLT W/ NUT AND WASHER 6' O.C. MAX. MIN 7" EMBEDMENT, 2 BOLTS PER PIECE WITHIN 12" OF EACH END. PLATE WASHERS 3X3X1/4"." Conflicting statements on the drawings have been corrected. 4. Page 9, calculations- Post Load Chart: Considering Gravity Loads Due To Snow, Occupancy, Wind, & Dead Weight — Post Location. Center Post Footing size has been increased to 21" x 24" reducing the design load to 1713 psi, within the design soil bearing capacity. Also shown in the drawings page 3, Foundation Plan.