Response to BLDG Comments 1.pdfEll C -1 -TS
NORTHWEST
Architects Northwest, Inc. P: 425-485-4900
18915 - 142nd Ave NE #100 F: 425-487-6585
Woodinville WA 98072 Toll Free: 1 -888 -ARCH -100
Website: www.Architec[sNW.com Email: ANW@ArchitectsNW.com
City of Edmonds
Building Division
Attention: Eric Carter, Plans Examiner
Plan Check: BLD2016-1717
Project: New SFR
Project Address: 9401 — 234th Street SW
In response to your correction letter dated March 17, 2017.
Sheet A4
v ES U B
min
�14AY 11 2017
�`i��flt°i°Ft,i.,
f fl'iu� i �� DPA iii )s
5/5/2017
1. Added HDU8 holdowns to the foundation plan at the interior full height stem.
2. Detail 11/S2 applies only to the holdown HDU8. Revised the Holdown callout to include reference
to detail 11/S2.
Sheet A5
3. Revised Garage Note for 5/8" Type'X' gypsum. board at the ceiling.
Sincerely,
Sarah Weight
Project Manager
Architects Northwest, Inc.
Office: 425-485-4900
Office Fax: 425-487-6585
Toll Free: 1 -888 -ARCH -100
www.architectsnw.com
sarah@architectsnw.com