Response to BLDG Comments 1 (5).pdf11 June, 2018
City of Edmonds
Building Division
121 5tn Ave. N
Edmonds, WA 98020
Attention:
Eric Carter
Re: Plan Check: BLD2018-0462
Project address: 24208 100t" Ave. W
REsv B
IUN I .l 20%
BUIL� DMUN S�
Eric,
Please find attached with this summary letter two sets of the
revised drawings:
General:
1. Please find revised sheets A3 Site Plan, A4 Floor Plan, A7
Exterior Elevations & A8 Building Sections showing elected
credits and their location.
2. Revised elected credits are: 1a and 3b.
A4
3. Please see Sheet A5 RCP, and Section 1/A8 for location &
description of proposed "whole house ventilation".
4. Proposed Garage heater was removed, see Sheet A4, Floor
Plan.
5. Please see Sheet A3 Site Plan, and A4 Floor Plan for location
of intended outdoor heat pump and ultra -efficiency indoor &
wall mounted unit, SEER: 20.5 - 26.
Please do not hesitate to contact me if you have any questions or need
further clarifications,
Very truly yours,
Mariusz Rynkiewicz
206.474.5909