Loading...
response to bldg comments 1.pdfB1d9 �`vn-/-� 1- 111 January 15, 2018 City of Edmonds 12151h Ave N Edmonds, WA 98020 Attn: Chuck Miller RESUB JAN 16 2016 BUILDING DEPARTMENT CITY OF EDMONDS RE: Bracket Apartment Clubhouse alterations BLD2017-1582 MIIBRANUT AR(HITE(TS The following are our responses to the plan review comments dated December 281h, 2017. Item 1. This information has been added to sheet S1. Item 2. List of drawings corrected on Sheet Sl. Item 3. Something happened with the scaling at the printer but it has been corrected on the resubmittal. Item 4a. As indicated in my previous email the door and wall being removed is between the spa and pool and will remain in a secured area and will not need Health Department Review. The new openings are proposed to be supported by a new post and beam system (as revised per comment # 36.) The new post and beam system is sufficient to maintain the structural integrity of this portion of the building. The supplemental structural calculations demonstrate a complete gravity load path at this location. Item 4b. The windows added to the business center are new windows where there was none before. The style of the new windows is to match the style of the existing windows. Note revised on Al. Item 4c. Even though the use of the rooms have switched around a bit in the building the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 4d. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 5a. The existing and proposed spaces have been labeled on sheets Al and A2. Item 5b. Spacing has been revised on sheet A2. Item 6. An architectural stamp has been placed on both the A sheets and ID sheets and a structural engineer stamp on the S sheets. Item 7. All plan sheets have been coordinated together and the correct spaces represented. Item 8. All plan sheets have been coordinated together and the correct spaces represented. Item 9a. All plan sheets have been coordinated together and the correct spaces represented. Item 9b. All plan sheets have been coordinated together and the correct spaces represented. 25 (ENTRAL WAY SUITE 210 : KIRKLAND, WA 98033 : 425,454,7130 : WWWAILBRANDTAR(H [oM January 15, 2018 Page 2 of 4 Item 9c. As indicated in my previous email the door and wall being removed is between the spa and pool and will remain in a secured area and will not need Health Department Review. The new openings are proposed to be supported by a new post and beam system (as revised per comment # 36.) The new post and beam system is sufficient to maintain the structural integrity of this portion of the building. The supplemental structural calculations demonstrate,a complete gravity load path at this location. Item 9d. The windows added to the business center are new windows where there was none before. The style of the new windows is to match the style of the existing windows. Note revised on Al Item 9e. Even though the use of the rooms have switched around a bit in the building the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 9f. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 10. All plan sheets have been coordinated together and the correct spaces represented. Item 11. All plan sheets have been coordinated together and the correct spaces represented. Item 12a & b. All plan sheets have been coordinated together and the correct spaces represented. Item 13a. All plan sheets have been coordinated together and the correct spaces represented. Item 13b. All plan sheets have been coordinated together and the correct spaces represented. Item 13c. As indicated in my previous email the door and wall being removed is between the spa and pool and will remain in a secured area and will not need Health Department Review. The new openings are proposed to be supported by a new post and beam system (as revised per comment # 36.) The new post and beam system is sufficient to maintain the structural integrity of this portion of the building. The supplemental structural calculations demonstrate a complete gravity load path at this location. Item 13d. The windows added to the business center are new windows where there was none before. The style of the new windows is to match the style of the existing windows. Note revised on Al Item 13e. Even though the use of the rooms have switched around a bit in the building the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 13f. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 14. All plan sheets have been coordinated together and the correct spaces represented. Item 15a. The compass designation has been corrected. Item 15b. This has been located on sheet A2. Item 16a. The compass designation has been corrected. Item 16b. This has been located on sheet A2. Item 17a. The compass designation has been corrected. Item 17b. This has been located on sheet A2. Item 18. The compass designation has been corrected. January 15, 2018 Page 3 of 4 Item 19. The compass designation has been corrected. Item 20. The compass designation has been corrected. Item 21. The compass designation has been corrected. Item 22. The compass designation has been corrected. Item 23. The compass designation has been corrected. Item 24. The compass designation has been corrected. Item 25. The compass designation has been corrected. Item 26. The compass designation has been corrected. Item 27. The compass designation has been corrected. Item 28a. All plan sheets have been coordinated together and the correct spaces represented. Item 28b. All plan sheets have been coordinated together and the correct spaces represented. Item 28c. Even though the use of the rooms have switched around a bit in the building the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 28d. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 28e. Only two doors will be new. We have indicated size and hardware type on the plan sheet Al. Item 29a. All plan sheets have been coordinated together and the correct spaces represented. Item 29b. Only two doors will be new. We have indicated size and hardware type on the plan sheet Al. Item 30a. All plan sheets have been coordinated together and the correct spaces represented. Item 30b. All plan sheets have been coordinated together and the correct spaces represented. Item 30c. Even though the use of the rooms have switched around a bit in the building, the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 30d. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 31. All plan sheets have been coordinated together and the correct spaces represented. Item 32a. All plan sheets have been coordinated together and the correct spaces represented. Item 32b. All plan sheets have been coordinated together and the correct spaces represented. Item 32c. Even though the use of the rooms have switched around a bit in the building, the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 32d. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 32e. The WSEC Compliance Form is included with the appropriate information. Item 33a. All plan sheets have been coordinated together and the correct spaces represented. Item 33b. The WSEC Compliance Form is included with the appropriate information. Item 34a. All plan sheets have been coordinated together and the correct spaces represented. January 15, 2018 Page of 4 Item 34b. All plan sheets have been coordinated together and the correct spaces represented. Item 34c. Even though the use of the rooms have switched around a bit in the building, the primary function of the clubhouse has not changed. The lower level has access to both the restrooms and drinking fountain. The upper level went from one type of office to a different type so again the primary function stayed as is. Item 34d. There is an existing drinking fountain on the ground floor which is now noted on the plans. Because the primary function of the building has stayed the same we are hoping the existing DF can remain. Item 35. All plan sheets have been coordinated together and the correct spaces represented. Item 36a. The referenced beam has been up -sized. Item 36b. A T-0" square footing has been added to the structural plans to support the post under the west end of beam B1. A new footing detail has been added to the structural details sheet. If you have any further questions, please do not hesitate to contact me. Sincerely, Robert E. Weible, AIA Milbrandt Architects, Inc., P.S