City of Edmonds
BUILDING DIVISION
Re: SportClips: 21940 Hwy 99
Plan Check: BLD2016-0233
Chuck,
rr
dit of EbMONDS
1. Provide as part of a complete permit submittal the Washington State Energy Code (WSEC)
Compliance Forms for Commercial Buildings for the lighting specified on sheet `CS1.1' —
Lighting Fixture Schedule - and represented on sheet `A1.3' — detail 4 — Reflected Ceiling Plan.
The forms can be found here - http://www.neec.net/energy-codes .
On the cover sheet:
2. Project Data/Code Summary — Exiting — Change on the plans the indicated number of
provided exits from `2' to `1' to reflect that represented on the plans.
See Cover Sheet r revision,
3. Occupancy Type — Change on the plans the most restrictive occupancy classification governing
the required construction for nonseparated occupancies from `B' to `A-2'. See Cover Sheet
for revision
4. Occupant Load
a. Eliminate from the plans the occupant load determined using a `room -by -room'
calculation method. That option does not exist in the 2012 International Building Code
(IBC). ,See Cover Sheet or revision
b. Change on the plans the calculated occupant load from `12' to `11'. There are no
provisions for `rounding up' in the 2012 IBC.
See Cover Sheet Lor revision
On sheet CS1.1:
5. Finish Notes
a. Door Notes #1 — Clarify the indicated height for the installation of the coat hook on the
interior surface of the restroom door. It does not appear to comply with that required
per ICC A117.1-2009 section 603.4/3o8.
b. Flooring Notes #3 — Change on the plans the referenced code version from `2oo6to
`2012'.
See Sheet CS1.i LotM revisio:tl
Project Number: 1634 Page 1 of 3
C,leatinq V1OS nve- IIII 5icni-, in r,hr Built Environment
2548 SE Ankeny St. Portland, OR 97214 1 Office - 503.644.4222 Fax - 503.233.8792 1 succeed@leekainc.com www.leekainc.com
On sheets Ao.1 and A1.4:
6. Detail 1— Floor Plan —Clarify the identified use of space `103' —Dispensary. It appears to be
identified for a different use on sheets `A1.1', `A1.2', and `A1.3'. Room lo7 is the
e istiii ToiletRoorn. Room toy hs the Dh erl.sar and is used to rnix any
rxecessarl -lair ftoduct it also doubles for the Utili V Rooin since is
houses the 'Wt'"ater• Heater and "rasherDr• er.
7. Detail 2 — Key Plan — Clarify the purpose of the represented plan. The indicated scale appears
to be incorrect and other information may have been omitted by accident. Detail 2 —
Key Plarr ;s just indicating what portion o the building, the 77 is located.
On sheet A1.1:
8. Finish Plan
a. Change on the plans the identifier for the `Finish Plan' from `2/A1.1' to another not
already utilized on the same sheet. Section `2/Al.l' is identified the same and is
correctly referenced on the `Fixture Plan' — 1/Al.l. Iden ffiers mere r-emoved to
avoid confusion
b. Indicate on the plans the location of `Detail 7' referenced in the north corners of space
`104' — Shampoo — to guide proper installation. An applicable detail appears to be
found on sheet `A1.2'. Detail 7, on A1.2, h; re er-enein V2' Cabinet-, ttlris is
located in Room rol. Not sure what you are reLei-riz-gg to in Room 10
9. Door and Room Finish Schedules - Indicate on the plans the location of the referenced notes
in the `Remarks' column to guide proper installation. Applicable notes appear to be found on
sheet `CS1.1'. ,dee Sheet .A 1 r or `Re erence' mote or- Door and . .nish SchedWe
Remarks
On sheet A1.2:
1o. Detail 3 — Construction Plan
a. Provide on the plans a reference to details indicating the required construction criteria
of the proposed walls to guide proper construction and inspection. Applicable details
appear to be found on sheet `Ao.1'.
See SheetAi.2 note airlded to re r-ence'W all DetailSheet.
b. Clarify the proposed work to be done in space `103'. The space is identified as an
`existing' restroom on sheets `Ao.1', `A1.1', and `A1.4', and the work does not appear to
be included in the project scope of work. See also plan review note # 1o. The tenant
wanted the Door'WF`all tbrroont iq3 and ig4, to be on the surae plane thus
we are relocating the Toilet Room door wall.
C. Indicate on the plans the location of `Detail 11' referenced in the north corner of space
`105' — Equipment — to guide proper installation. An applicable detail appears to be
found on sheet `A1.3' but it is numbered differently. See Sheet .A1..,2', Ai..,i, correct
designation.
A1.3:
11. Reflected Ceiling and Electrical & Plumbing Plans - Clarify the proposed work to be done in
space `103'. The space is identified as an `existing' restroom on sheets `Ao.1', `A1.1', and `A1.4',
Project Number: 1634 Page 2 of 3
2548 SE Ankeny St. Portland, OR 97214 1 Office - 503.644.4222 Fax - 503.233.8792 1 succeed(cNeekainc.com www.leekainc.com
and the work does not appear to be included in the project scope of work. The tenant
wanted the I)oor• Wall far room rode and io4, to. be on the same Plane, thus zve
are YvLogaling the Toilet Roorn door toall.
12. Detail 4 — Cashwrap
a. Clarify the reference to `General Notes #2 & #18' on sheet `CSi.i'. Notes numbered the
same on sheet `CSi.o' — General Notes — do not appear to correspond to the proposed
work. Similarly numbered notes on sheet `CS1.1' — Electrical - appear applicable to the
referencing detail.
See Sheet,Ag. or clarification kation to "131eeft-ieal Notes" r-ather than g eneral
Notes"
b. Indicate on the plans the accessible sales and service counter (or portion of that
proposed) meeting the requirements of ICC A117.1-2009 section 904.1. See Sheet
A o.i. or• Tai-allel Approach"and eogntei• at 6".
For additional questions or information, please contact Neil Lee at Ncii.le(, (ii,)Ieekaitic.cf)nt , 503-644-4222
Thank you,
Tanning
Project Number: 1634 Page 3 of 3