Response to BLDG Comments 1.pdfWARE MALCOMB
architecture I planning I interiors I branding I civil
March 28, 2017
Leif Bjorback, Building Official
City of Edmonds
121 5th Avenue N
Edmonds, WA 98020
RE: Application #BLD20161520
Project Name: Edmonds Village
Project Address: 22019 Highway 99
Dear Mr. Bjorback,
B 11 DING DIEPAKIMENT
GIS OF EES ONDS
Itemized below is our response to the review comments for the above referenced project. Our response
appears in bold.
BUILDING DIVISION
General
1. Special Inspections have been identified on the plans for this project. Please complete and return
the attached special inspection agreement forms. This may be done any time prior to issuance of the
permit.
See attached special inspection agreement forms. We do not have a contractor at this time.
Sheet A0.1a
2. In the General Building Heights and Area section of the notes, indicate whether the building will be
designed as a having separated occupancies per IBC 508.4 or non -separated as per IBC 508.3. It
appears they are to be separated because of the 2 hour wall shown elsewhere in the plans. Please
clarify.
The building will be designed as a having separated occupancies per IBC 508.4
Sheet A1.0
3. In the Egress Information table, an occupant load of 148 is shown for the coffee shop. We
understand that this number is shown merely for the purposes of calculating the width
requirements for means of egress; however, please be aware that under the future design of the
buildout of the coffee shop tenant space, fire sprinklers will be required if the occupant load of the
fire area that includes the A-2 coffee shop exceeds 99. IBC 903.2.1.2
Understood. This will be addressed in the tenant improvement as needed.
3015 112th Ave NE, Suite 205
Seattle, WA 98004
ph. 425.670.6706 1 f. 425.774.8219
www.waremalcomb.com
Edmonds Village Retail March 28, 2017
BLG1/PLANNINGI/FIRE1/TRASHI/PRETREATMENTI Comment Response Page 2 of 2
.............................
Sheet A2.1
4. The wall marking at the demising wall on the floor plan does not match the marking symbol shown in
the Wall Legend. Please clarify.
Updated legend symbol.
5. Provide a detail reference callout on sheet A2.1 for the construction of the 2 hour rated wall. It
appears that the details on sheet A8.5 pertain to this wall. Please add the details or a cut sheet of
Wall assembly U423 to sheet A8.5 to ensure proper construction of this wall.
Addrested. Shown on A8.5 to show 2 hour rated wall condition.
Sheet A5.1
6. Provide clarification as to the extent of the slab insulation shown in several details on this sheet.
Show the R value of the rigid insulation and a thermal'break at the slab edge. This information will
need to agree with the design of the component performance approach as presented in the energy
forms for this project.
Completed. Notes shown on sheet ASA
WARE MALCOMB 3015 112' Ave NE, Suite 205
Seattle, WA 98004
ph. 425.670.6706 1 f. 425.774.8219
www.waremalcomb.com
ENGINEERING
March 17, 2017
civil & structural
engineering & planning
Leif Bjorback, Building Official
City of Edmonds, Building Division
1215 th Ave North
Edmonds, WA 98020
RE: Plan Check: BLD2016-1520
Project Name: Edmonds Village Commercial Shell
Project Address: 22019 Highway 99
Dear Mr. Bjorback,
EE, ioo �.
MAR
R 6lli"
Itemized below is our response to the review comments in the February 1, 2017 letter for the above
referenced project. Our response appears in bold.
Sheet S2.2
9. Indicate on the Roof Framing Plan the header sizes at 5 locations in gridline A, gridline B and gridline
1. These sizes must match the calculations from CG Engineering.
The header sizes have been added to Sheet S2.2. Header sizes not marked are 4x8 HF#2 as
indicated in plan note 5 on Sheet S2.2.
Sheet S2.2
10. Page 10 of the soils report states that "all footings should have a minimum width of 18 inches."
Footing TV is shown on the plans as 16 inches. Please revise the plans as needed.
The footing "F1" on sheet S3.1 has been updated to show an 18" width. The foundation
calculation has been revised in the attached supplemental calculation package.
If you have any questions or comments regarding the responses to this review please do not hesitate to
call.
Sincerely,
CG Engineering
Carolyn Jewett, PE, SE
Project Manager
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
ROBISON ENGINEERING, INC.
19401 40- AVE W, SUITE 302
LYNNWOOD, WA 98036
(206) 3643343
DATE: March 27, 2017
TO: Leif Bjorback, Building Official E,. LSI
City of Edmonds MAR
2017
FROM: Mark Manglicmot �BI w I G DE PAIRT° ENT
PROJECT. Edmonds Village Commercial Shell
22019 Hwy 99
Edmonds, WA
SUBJECT: City Comment Responses
DISCUSSION:
The purpose of this memo is to provide narrative responses to plan check comments.
Responses to comments are in bold.
PLAN REVIEW COMMENTS
Energy
2. A number of energy compliance forms were submitted within the application
packet for this project, however several pertinent forms were not included.
Referencing form `PROJ-SUM', this form includes instructions in the General
Compliance Path notes for the chosen Total Building Performance (TBP) path.
Please fill out and provide all of the forms listed within these notes in order to
identify all of the energy code requirements for the project.
See sheet M2.0, M2.1, and M2.2 for energy forms.
3. Additional information is required on the plans showing compliance with the
energy code requirements as mentioned in the previous comment. The energy
compliance forms themselves state what information is required by code to be on
the plans. A complete review of energy code requirements cannot be performed
until the necessary information is provided on the compliance forms and the
plans.
See sheet M2.0, M2.1, and M2.2 for energy forms.
Sheet M0.0
12. Please update the WSEC Commissioning section of the General Notes on this
sheet to reflect the 2015 WSEC requirements.
See sheet M0.0 for revised energy code notes.
Page 1 of 2
Sheet MO.1
13. Smoke detectors are required in the return air ducts of the FCU units with airflow
greater than 2000 cfm. Please show these on the plans. IMC 606.2.1
See sheet M1.0, duct smoke detectors provided.
14. Please re -calculate the outside air volume provided for each of the Indoor Air
units. According to the Indoor Air Unit Schedule, each of the 4 units are designed
for 200 cfm; however, this amount appears to be seriously inadequate for the
coffee shop side of the building. This comment is simply advisory, as the ultimate
outside air requirements will be determined at the time of tenant improvement
permitting. IMC Equation 4-1
See sheet M0.1, Ventilation Calculations provided.
End of Memorandum