Response to BLDG Comments 1.pdfCity of Edmonds
Development Services Department
1215 TH Ave N.
Edmonds, WA 98020
Attn: Chuck Miller Plans Examiner
Re: Response to Plan Check: BLDG. 2014-0914
Project: GW Auto Rebuild Addition - Remodel
Project Address: 23510 Hwy 99, Edmonds
Sir, I shall answer your corrections in order as received:
1. Mechanical:
March 11, 2015
1a. Yes there are (2) each Heaters for this Project. (1) is a 58k BTU Gas Unit Heater that will be placed in
the New Addition just West of the center line on the North Wall (Supplied by Customer), and (1) ETL
Listed GFS Roof integrated Space Saver Heat System located on the top side of the CTOF Booth Cabin,
located at the Southeast corner inside the Existing Paint Shop.
1b. There is no Boiler on this Permit. I wrote down "Boiler" on the wrong line instead of "Other":
I have filled out another Form E - Page 2 and supplied a copy with this response letter.
(See Attached)
2. Fuel Gas:
2a. I thought I was doubling up a little confused on the form. I have filled out another Form E - Page 2
and have it attached.
2b. There is no Boiler associated with this Project. I had written my CTOF Heater on "Boiler" line
instead of the "Other" line. Therefore, since No Boiler exists, we do not need to apply for a separate
permit for the Washington State Department of Labor & Industries for the installation of a Commercial
Boiler.
3. "Proposed Shop LaVout"
3a. Table of Areas has been added to Page A-1. The Total Area of the Structure is 6577.51 Sq. Ft. The
Total Aggregate Area of the Booths cannot exceed 10% of the Total Area of the Structure or 1500 Sq. Ft.
Area of Structure is 6577.51 Sq. Ft. x .10% = 657.751 Sq. Ft. The Aggregate Area of the Booths = 655.579
Sq. Ft. 655.579 < (is less than) 657.751 therefore the 2 Booths are Allowed
3b. The Mixing Room is a listed Room designed to be attached to the Double Skin walls of the Paint
Booths - See Listing info provided. The Booth and CTOF Walls are Designed to have all Services RE: Lights
to be Serviced and Maintained from the Inside of all Equipment therefore there will be no need to
maintain a 3 Ft. Separation.
3c. I have also provided a "Wall Roof' detail per your instructions, see Page A-3 (New Page to Plan Set).
3d. The ARRC 2100 Heater is located on Several pages, Please Note: The Heater is part of the CTOF
Cabin Ceiling Assembly.
Here are a few of the Locations it can be found on the Drawings & Spec Books:
1. On Page A-1 Proposed Shop Layout on the Roof of the CTOF
2. Page A-2 Section A/A and Existing West Elevation, the Heater is shown on the Roof of the CTOF
3. Assembly Instructions Page 2, Part #AI-PSVDP-27 1409.DTP-44, Sheet 1 of 5. Part #1 Specs the
Heater AHRC2400-H-D = Horz, Air Heater - Down Discharge Sheet 1 of 5
4. Assembly Instructions Page 4, Part #IN-AHRC2400-H-DD, Sheet 1 of 3 Shows Horizontal Air
Heater Down Draft
5. The Heater is shown several times in that packet of Drawings
6. There is a Color Space Saver Heater Brochure stapled with the Product Packages on the Left
hand side of the plan set
7. There is an Intertek "CDR" Listing Constructional Data Report #3164777CRT-004 Attached to the
Left Hand side of the Plan Set, It gives you Photos (Black & White)
79TRIPTIMEVA
4. The Grab Bar: Vertical Fixed Grab Bar has been added to our typical ADA Complaint Rest Room
Drawings as shown on Page A-2
On Sheet S-1.0
5. Footing Schedule has been Revised, please see attached Structural Design Associates SDA Project
#7358 Response, Dated November 17th, 2014
Respectfully,
Henry Byam
Wesco Construction Division #WESCOCD077CZ