Loading...
Response to BLDG Comments 1.pdf4= elm ----------------- ENGNNEERING December 09, 2014 Andrew Gahan, Plans Examiner City of Edmonds Building Division 1215 th Avenue N. Edmonds, VVA98OZ0 RE: Plan Check: BLD2O14-1183 Project: Cloutier Residence — Interior Remodel Project Address: 1118 8th Avenue S., Edmonds, WA Dear Andrew, Itemized below is our response to the review comments in the (12/03/14) review for the above referenced project, Our response appears inbold. 1. Please clarify the loading condition, span and bearing points for the rafters that are to remain. |tappears there are 2x5 rafters spanning approximately IZ'+. Please provide a beam calculation for the existing rafters. Refer to the additional structural calculations on page 3 and 8.1. New 2x12 furri the 12' span rafters. I 2. Clarify how the furring rafters indetail S/S2.1will beauppoded/monnected. Refer tothe updated detail 5/02.1. New sisteredrafters will henailed tothe existing rafters with 1Odnails spaced ot 6 -inches. The existing rafters will continue tmbear onto the wall top plate. l Please verify that smoke detectors will beinstalled per IRC R314and that aO} detector will beinstalled per IRC R31Gduring this remodel project. If you have any questions or comments regarding the responses to this review please do not hesitate tocall. Sincerely, CG Engineering DennbTitus,PE, SE