Loading...
Response to Bldg Comments 1.pdfEMERALD CITY ENGINEERS, INC. 6505 21611 Street SW, Suite 200 Mountlake Terrace, WA 98043 DATE: 28 October 2014 TO: Chuck Miller City ofEdmonds Building Division 121 5th Ave N Edmonds, VVAA8O2O FROM: Nicholas King Emerald City Engineers, Inc. O5O521OthStreet SW, Suite 200 Mountlake Terrace, WA ' PROJECT: Post Office - Plumbing �W ~m'��ml 130 2nd Ave N ��T�-^~� �+�o����� Application #: b|d20140943 Emerald City Project Number: 2071-004 SUBJECT: Edmonds Post Office Engineering Plan Check Correction Plumbing Responses 6111ININITIMr The purpose ofthis memo ishmprovide narrative responses b)plan check review comments, Emerald City Engineers responses tocomments are inbold print. 1\ Storm Drain Sizing Note - Change the table reference from '11-2'to'1101.7. -hanged to "1101.7" 2) Basement Plan: a) Change the square footage noted otthe 6^rain leader e{gridline 'B/3]5'from '13775 to '13415' Onsheet P2I0mdGrind line Band 3j,the G^rain leader square footage number was changed from °13775"bo°i3415'. b) Change the square footage noted at the 6" rain leader at gridline 'A/2.25'from '16150'to changed from "113775" to "l 3415". c) Clarify the difference in the water supply connection shown and that required and represented on separately submitted drawings under permit 8LD2014-0074.While h provides adequate supply for the proposed domestic plumbing fixtures, it may not when also connected k)the required fire sprinkler system. Civil will need to upsize their 2"water supply to either 3" copper pipe or 4"PVC. Upon entering the building five feet, wvewill run4''PVC according to plumbing code. Page 1 of 2 3) Indicate on the plans the required venting for the [dumbing fixtures represented in ) bounded byghd|inea'F.2S'and '3.1' While some appear toboshown, the venting ofh#bn)fix1Unesif,m�' auuhaadhoueidenhfiodintha(areaaa'11'.'1S'.and'1T.iunntnepresenbad. Found plumbing fixtures that were missing vents and added vents asneeded. Plans P2.02, P2.03, P.204 and P2.05 now show missing vents with routing to roof and locations on roof. 4> 2nd F|oorP|an—ChangmUhe \wasbskentriser identifier' atgridline 'B.5/3 from '2'bo '12' 5\ 3mFloor Plan —Change the \wosbakmndriser identifier' aigridline '13.5/3'from '2'to'12'. To= 1=1 FM7=017WMTFMU( �*75-'M—STTNSM 6) 3mF|oorP|en—ChanyaUhe\wu(eraupplyriserk1enbfer'atghd|ino'B/3.3'fnomTyto'D' 7} 3mFloor Plan — Change the 'water supply riser identifier' sdgridline 'B/4.3'fnxn'F'tn'F. On sheet P2.04, the water supply riser identifier at gridline B and 3.3 was changed from "P` 8) Indicate on the plans the venting for the 'future' plumbing fixtures represented on sheets 'P2.02' and 'P2.03' at gridline 'C/2.5' Vent for "Future plumbing fixtures" routing was shown on sheets P2.04 and P2.05 9) Waste and Vent Riser Diagrams on Sheet P4.00 a) Diagram #10: Change the fixture identifiers from "BA" to "CW" b) Diagram #15: Change the "flag note" identifier from "3" to "2". 10) Horizontal Wet Venting Notes 11111111!11111! l!1I b) Noka#8: Change the table reference from '10-1'to'iO02.2' o) Note #G -Change the table references from 7-3 to7U21'and from 7-5 to '703.2'. 'rhe section references for Note 6was changed from ''7'3''hm'^702.1"and "7'5"to 11\Trap Arm Notes — Change the table reference from '1O-1'to'10O2Z 12) HoQ Nohas—C|orifyJhe reference br'DWG P4.02. Detail 10'forpiping ofsuds producing fixtures. Sheet'P4.02' could not be found among the submitted construction documents. Flag note one was changed tonow reference detail 1onsheet P4.O2 that shows pipe routing for suds producing fixtures Page 2 of 2