Loading...
RESPONSE TO BLDG COMMENTS 2.pdfewcade 53uiedm NW 3tw. 7108 6561 Clue SC sudwasi Ft, `ti a 98290 425-231-5277 425-377-0734 Sax Be # CASCABOOONB RESUB JUL 17 2017 BUR DW DEPARTMENT CITY of EDMONDS Response to requested additional information — 4/05/2017: 1. Declaration of energy credits appear on page 2 of revised plans. 2. Vented 100 cfm fans with switch control have been located in the Family room first floor & hallway second floor on page 2 of revised plans. 3. See energy credits page 2 of revised plans. 4. a. Pg. 2 of revised plans b. Pg. 2 of revised plans C. Pg. 2 of revised plans d. legend note — Pg. 2 of revised plans e. The existing dwelling has 3 B/R, Family Rm & Proposed Family Rm — all of which exceed 120sf. f. The sink has been repositioned — Pg. 2 of revised plans g. Pg. 2 of revised plans h. Pg. 2 of revised plans i. J• Sheet 3: 5. See revised drawing page 3 6. See revised drawing page 3 7. See revised drawing page 3 8. See revised drawing page 3 9. a. See page 4 of revised plans —the ex. slab on grade was undermined during previous construction (2013) and inspected by Edmonds building inspector. b. C. ewcade 53uitdew .N`lU Jac. 7108 65t& aae SE suohond.6k wa 98290 Q 425-231-5277 425-377-0734 gam .eic # CAScae000NS 10. a. b. Anchor bolts shall 5/8" diameter —see revised pg. 4 RESUB JUL 17 2017 E3UH.DING DEPARTMENT CITY OF EDMONDS p�Np4 July 11, 2017 Cascade Builders R E 3 U B Attn: Zeke Barnsworth JUL 17 2017 7108 650' Ave SE Snohomish, WA BUILDING DEPARTMENT CITY OF EDMONDS Subject: Building Official Comments SDA Job # 7730 To whom this may concern: At your request, this office reviewed the subject project to answer the building official comments. Following is our response to those comments: 4. Proposed First Floor Plan: i. A new beam line has been added. MST 37 straps connecting the beam line to the shearwall, completes the shear path to the main level shearwalls, (see detail 3/S-3.0). j. See detail 3/S-3.0 9. Proposed Foundation Plan Please contact this office if you have any questions concerning this letter, or for any other assistance. b. See revised foundation plan and footing schedule on 4/S-3.0. c. See revised foundation plan and footing schedule on 4/S-3.0. d. See detail 5/S-3.0 10. Footing Detail a. See revised detail 5/S-2.0. b. Note added "see shearwall schedule" c. Connection details added, (see S-3.0). d. Structural elements added to plans. e. Structural calculations enclosed. 11. First Floor Framing Detail a. Floor joist require 11 7/8 TJ1210 @ 16"" o/c, (see attached calculation). 12. Second Floor. Framing Detail a. See 11. b. See revised plans c. See revised plans d. Per architect e. mono trusses are show-q on the piasis 13- Cross Sections a. Stairs revised on First, and second floor frarning plans 14. Detail at,.loor Joist a. 'rlai floor joists revised. Sznc�;rely. chric C3,1ifA.gton, z .ice.