Loading...
RESPONSE TO BLDG COMMENTS RND 2.pdf" rl I_ANDS( AI'I_ AlU III I LC I OW November 17, 2014 Leif Bjorback, Building Official " RE: Edmonds City Park Spraypark — Permit Review Dear Lief: Please see below for our response to your Plan Review Comments dated October 10, 2014: 1. Snohomish Health District has not completed its review of the project but has committed to providing a plan review letter by November 21, 2014. Once this letter is received, we will forward to you for review and identification/clarification of any required changes to the Building Permit documents. 2. Capital Projects Manager Ed Sibrel will be completing and submitting the required special inspection forms for soils. 3. Handrails have been provided on each side of project stairways. See revised sheet L1.10 Layout Plan. 4. As discussed in our meeting on October 14, 2014, the mechanical building slab and foundation will be designed to meet seismic category D. The building design and associated structural calculations will be submitted separately upon purchase of building by City of Edmonds. The design documents and calculations reviewed during the meeting were provided by the manufacturer as an example submittal and to clarify that building will meet seismic requirements. Please let us know if you have any questions or need additional information from our team to review/approve the spraypark design. Sincerely, Brian Bishop Site Workshop, LLC Cc: Carrie Hite, City of Edmonds SHMORKSHOP, LLC,. 22211RUR IA SIPILP, SUIIU2001 SF At11_B WAS I[INGf01198109 2061 53026 www.sitvowoIkshop.net