Date: April 23, 2014
Project: BLD2013-1370 — Goebel SFR
Re: Building Comments March 31 2014
"!-�l c o n I o;� .'i'
See structural reply to #28
See structural reply to #28
See structural reply to #28
i
A
Gill.
See structural reply to #28
D,,do,.H'O! tho, (;(OC
to I J�
T'
Ot 1 1 �
A I I
1 N�H MAW
H ii
I v"t; "€11'i 11(m h— u
,� c o I ic V ' I , -no, ;",ovi(k,{"
IfJ t �1, No
Af,
I',1, ,3 L
Notes updated per code. Text from code used.
CIqiov, lhr. (;jf` ,d3 jf�
C t<> —iI
vi I k i
Holdowns changed to be match structural.
Holdowns changed to be match structural.
.3"t ;L
See structural reply to #28
ih,"I di
fe, I
3 1 11 1 if 6 :lint kn-d
See structural reply to #28
, f
k ri i 11"'. 1 , C
-A j
- i it it
See structural reply to #28
See structural reply to #28
See structural reply to #28
`I 7 ViI j i
111 thw
rw[("d in
See structural reply to #28
n v,':ndov "-X a;
BYKOHEN
CARTER
QUINN
STRUCTURAL
ENCINEIRING
opm: April 10m'2U14
To: Chris Pardo Design
152O11mAvenue, Ste G
Seattle, WA 98122
Attn: Joe Malboeuf
Re: Permit Corrections
From: Nicholas Carter
Project: Goebel Residence
Project#: MI
copy to: file
Attached are the structural responses tothe permit corrections dated March 31m, plan check:
BLD2013-1370.
22. Architect to modify drawing to correctly reflect ho|dovvDS ohmvvn on structural drawings.
23. Architect to modify drawing to correctly reflect footings shown on structural drawings.
24. Existing footing and slab -on -grade has been removed and a new footing and slab -on -
grade will be poured.
25. Architect to provide iDSU|mtinn details.
20. Callout has been added to the plans for the attachment of the new footings to the
existing. Existing slab on grade is not to be attached to the footings as is typical in new
construction.
27. (}varfranniDgdetail has been added tothe drawings.
28. Structural plans and revised calculations show the window openings per the latest
architectural drawings. The revised calculations submitted with the last set ofpermit
revisions have again been attached, with amore legible layout plan.
29. Refer response to#28.
30. The opening 0nthe structural drawings appears to have been approx. 12" different to
that shown Vnthe architectural. This has been corrected onthe structural drawings.
31. Refer response tV#28.
If there are any additional questions, please do not hesitate to contact me.