Loading...
Response to Building 2 comments.pdfCHRIS PARDO DESIGN Chris Pardo Design: Elemental Architecture 1520 11th Ave. Suite G Seattle, WA 98122 206.329.1654 Contact: Joe Malboeuf Date: April 23, 2014 Project: BLD2013-1370 — Goebel SFR Re: Building Comments March 31 2014 "!-�l c o n I o;� .'i' See structural reply to #28 See structural reply to #28 See structural reply to #28 i A Gill. See structural reply to #28 D,,do,.H'O! tho, (;(OC to I J� T' Ot 1 1 � A I I 1 N�H MAW H ii I v"t; "€11'i 11(m h— u ,� c o I ic V ' I , -no, ;",ovi(k,{" IfJ t �1, No Af, I',1, ,3 L Notes updated per code. Text from code used. CIqiov, lhr. (;jf` ,d3 jf� C t<> —iI vi I k i Holdowns changed to be match structural. Holdowns changed to be match structural. .3"t ;L See structural reply to #28 ih,"I di fe, I 3 1 11 1 if 6 :lint kn-d See structural reply to #28 , f k ri i 11"'. 1 , C -A j - i it it See structural reply to #28 See structural reply to #28 See structural reply to #28 `I 7 ViI j i 111 thw rw[("d in See structural reply to #28 n v,':ndov "-X a; BYKOHEN CARTER QUINN STRUCTURAL ENCINEIRING opm: April 10m'2U14 To: Chris Pardo Design 152O11mAvenue, Ste G Seattle, WA 98122 Attn: Joe Malboeuf Re: Permit Corrections From: Nicholas Carter Project: Goebel Residence Project#: MI copy to: file Attached are the structural responses tothe permit corrections dated March 31m, plan check: BLD2013-1370. 22. Architect to modify drawing to correctly reflect ho|dovvDS ohmvvn on structural drawings. 23. Architect to modify drawing to correctly reflect footings shown on structural drawings. 24. Existing footing and slab -on -grade has been removed and a new footing and slab -on - grade will be poured. 25. Architect to provide iDSU|mtinn details. 20. Callout has been added to the plans for the attachment of the new footings to the existing. Existing slab on grade is not to be attached to the footings as is typical in new construction. 27. (}varfranniDgdetail has been added tothe drawings. 28. Structural plans and revised calculations show the window openings per the latest architectural drawings. The revised calculations submitted with the last set ofpermit revisions have again been attached, with amore legible layout plan. 29. Refer response to#28. 30. The opening 0nthe structural drawings appears to have been approx. 12" different to that shown Vnthe architectural. This has been corrected onthe structural drawings. 31. Refer response tV#28. If there are any additional questions, please do not hesitate to contact me. nvc@mq-se.mm Op, 820 John Strept #201 SaatflG, WA 98109 206-264-7784 www.BGO-SExoni