RESPONSE TO BUILDING COMMENTS 1.pdfTo: Andrew Oahan , Plans Examiner
City OF Edmonds
Re: Plan Check: BLV2016-1106
Project: Trumper new 5FR
Project Address: 1-7ci05 Vista Del Mar Drive
The following is my response to your comments dated November 5,201(g,
Sheet AB
1, Revised Window Schedule and noted safety glass On dWg5-
2. Noted on plan
3. The entire house is hydropic heat b)
4. 1 revised the Energy Code Summary to show which options are selected to
equal 3.5 Energy Credits, the higher R values of insulation is noted on the
Summary and on various details thruout the plans.
Sheet A4
5. E3edrm 4 has a exterior door for egress but the windows also are sized for
egress.
6. Lateral calos are being resubmitted.
1. Window at stairway is noted as safety glass.
Sheet A5
5. Headers have been corrected.
Ci. Ridge beam/roof trusses have been corrected.
Sheet Ab
10. The :2x109 in section A/a4 have been changed to x1 s.
11. 1 noted on the section to fasten each truss and rafter with a A34 clip.
1:2. We are using the hydropic heat system with the tube wl shield attached under
sub -floor and will not acid any weight to the joists like concrete would, it
shows on detail 2/A6
13. Basement wall detail 1/A6 has been revised.
Sheet 5-4.0
14. Detail 1/5-4.0 has been deleted and replaced with retaining wall detail 13 on
!sheet A&.
Engineering
15. Key plan is attached to�his=sileet CAt,,r--0C4-n0tJ!!7
16. Lateral holdowns are now show on Upper Floor Plan.
17. This has been deleted, see detail 13/Ab
Thank you"-/"-'
-------------
Ronald T. McNurlen NOV 2 3 2016
0.X 4
(�IiYXrti,7 T,
L D T
o
'A R
H I
'T E C r
-c -a
—co —ne
40-2 —AvenueA--*
8 n o h o m i s h-, —WA
--§-82-9-0-0 (206)412-41383
-m-c n u -r —Ie n-@ m st t
To: Andrew Oahan , Plans Examiner
City OF Edmonds
Re: Plan Check: BLV2016-1106
Project: Trumper new 5FR
Project Address: 1-7ci05 Vista Del Mar Drive
The following is my response to your comments dated November 5,201(g,
Sheet AB
1, Revised Window Schedule and noted safety glass On dWg5-
2. Noted on plan
3. The entire house is hydropic heat b)
4. 1 revised the Energy Code Summary to show which options are selected to
equal 3.5 Energy Credits, the higher R values of insulation is noted on the
Summary and on various details thruout the plans.
Sheet A4
5. E3edrm 4 has a exterior door for egress but the windows also are sized for
egress.
6. Lateral calos are being resubmitted.
1. Window at stairway is noted as safety glass.
Sheet A5
5. Headers have been corrected.
Ci. Ridge beam/roof trusses have been corrected.
Sheet Ab
10. The :2x109 in section A/a4 have been changed to x1 s.
11. 1 noted on the section to fasten each truss and rafter with a A34 clip.
1:2. We are using the hydropic heat system with the tube wl shield attached under
sub -floor and will not acid any weight to the joists like concrete would, it
shows on detail 2/A6
13. Basement wall detail 1/A6 has been revised.
Sheet 5-4.0
14. Detail 1/5-4.0 has been deleted and replaced with retaining wall detail 13 on
!sheet A&.
Engineering
15. Key plan is attached to�his=sileet CAt,,r--0C4-n0tJ!!7
16. Lateral holdowns are now show on Upper Floor Plan.
17. This has been deleted, see detail 13/Ab
Thank you"-/"-'
-------------
Ronald T. McNurlen NOV 2 3 2016