Response to Comments from Arch to Plan, Eng, BLDG.pdfV p� 2 WATTENBAR IE Itects_ August 1, 2016 City of Edmonds Development Services Department 121 5th Ave N Edmonds, WA 98020 Re: Review comments, BLD2016-0562, BLDG2016-0563 2100 112" Ave NE #100 Bellevue, WA 98004 t:425-453-0606 f:425-453-4772 W n,"iWM" OF i B AWS I am writing in response to comments received for the building permits for the Willowdale Townhomes project. The following summarizes the changes that have been incorporated into the construction documents to address the review comments from city staff. Planning Department Review Comments: 1. Original grade: On Sheet A03, show the lines of original topography prior to redevelopment. New building height and lot coverage diagram has been added to sheet A03, and includes the requested topography lines. 2. Smallest rectangle: On Sheet A03, revise the height calculations to use the smallest rectangle that encloses each building, including any building overhangs and projections. Use the updated corner locations to recalculate the average original grade for each building. Bounding rectangle & corner point elevations have been added to the above referenced diagram. Average grade calculations are provided for each building. 3. Elevation lines: On Sheets A10 and All, use the revised calculations from #2 above and show the lines of 'average original grade, 'maximum allowed height, and 'proposed' or 'actual' height on the elevation drawings. Average original grade, maximum allowed height & proposed height are now shown on exterior elevation drawings. 4. 4:12roof. On Sheet A07, show that the roof pitches are at least 4:12 pitch for those portions of roof above 25' in accordance with ECDC 16.30.030.A sub 1. 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 . www.wattenbarger.com Erroneously omitted slope arrows have been added. Slope is to be 5:12 at roofs taller than 25% exceeding the code requirement. 5. Site data: Please copy the "Site Data" from Sheet A01 and add it to Sheet A03. Site data has been added to sheet A03. 6. Lot coverage: On Sheet A03, provide the lot coverage for each structure and the total coverage for all four structures as a percentage of the total lot area. Per ECDC 21.15.110,"[c]overage means the total ground coverage of all buildings or structures on a site measured from the outside of external walls or supporting members or from a point two and one-half feet in from the outside edge of a cantilevered roof, whichever covers the greatest area." Lot coverage calculations have been added to sheet A03. En ineerin tie artment Review Comments: 1. Submit a temporary erosion and sediment control plan. Site development shall be per previously reviewed and approved plans. TESC plan from original permit is included for reference. 2. Submit a utility plan clearly indicating all existing and proposed utilities and required utility separation. Dry utilities shall also be shown. Indicate meter size, pipe size, depth and invert elevations to confirm new connections to existing systems will meet minimum slope requirements. Site development shall be per previously reviewed and approved plans, copies of which have been included for reference. 3. Provide an Impervious Surface Area chart consistent with that provided in City handout E72. An Impervious Surface Area Chart has been included on sheet A03 and is consistent with City handout E72 and the Revised Stormwater Analysis dated 2/3/16 and previously submitted by Barghausen Consulting Engineers, Inc 4. Show tightline around the buildings and connection to the on-site storm detention system. Conceptual footing drain and downspout tightline have been added to the architectural site plan. Storm plan from original permit is included for reference; connection information is also shown on sheet C7. 5. Clearly distinguish between existing conditions and those improvements that are to be constructed under this permit (trash enclosure, on-site sidewalk, etc.). Provide details for elements to be constructed as applicable. 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 • www„ wattenbarger,com All remaining site improvements to be completed have been noted on a copy of the previously reviewed and approved plans, a copy of which has been included for reference. Building Department Review Comments: 1. The proposed work falls under the regulatory oversight of the Revised Code of Washington (RCW) chapter 64.55.005. As such, the following requirements must be met: A City of Edmonds 'Special Inspection and Testing Agreement' (see attached) must be completed and returned prior to permit issuance. In addition to the above requirement prior to permit issuance, the following will be required before a final inspection by the City of Edmonds can be performed on, and a 'certificate of occupancy' can be issued by the Building Division for, the permit when issued: The 'qualified inspector'shall prepare and submit to the City of Edmonds Building Division a signed letter certifying that the building enclosure has been inspected during the course of construction and that it has been constructed in substantial compliance with the building enclosure design documents. Special inspections form has been completed and returned as a separate attachment. On sheet A01— Project Data: 2. Project Data — Occupancy Classification (and on the City of Edmonds 'Commercial & Multi -Family Building Permit Application - Form E') - Clarify the difference in the indicated occupancy classification of the proposed structure and of that regulated under the scope of the International Residential Code (IRC) per International Building Code (IBC) 101.2. Note #1 of the 'General Notes' on sheet 'A01' and other notes in the following sheets appear to designate the IRC as the intended regulatory code governing the construction of the proposed structure. Reference to IBC occupancy classifications have been removed; replaced with "IRC 'Townhouse"'. On sheet A02 — Code Compliance: 3. Applicable Codes -Clarify the difference in the indicated regulatory code governing the mechanical systems of the proposed structure and of that regulated under the scope of the International Residential Code (IRC) per International Building Code (IBC)101.2. References to IMC & UPC have been removed from sheet A02; it is our intent that mechanical systems are to be governed by the IRC. 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 • www.wattenbarger.com 4. Building Code Analysis a. Update on the plans the following provided information to reflect that required per IRC Table R302.1(2): • Exterior Walls • Projections Reference to Table R302.1(2) has been added to exterior wall & projections notation on sheet A02. b. IRC Section R310 —Emergency Escape Openings —Change on the plans the maximum measuring point above the floor for the emergency escape and rescue opening from 'sill' to "bottom of clear opening' per IBC 1029.3 and IRC R310.1. Correction added to sheet A02. On sheet A06 — Second Floor Left: 5. Second Floor Plan — Left a. Indicate on the plans the required safety glazing for the windows marked 'Cl' in 'Bath #1' of 'Unit 07' and in 'Bath #1' of 'Unit 08' per IBC 2406.4.5 and IRC 308.4.5. Window schedule has been updated to require safety glazing at window type C1. b. Clarify on the plans the difference in the proposed 'open to below' floor plan of 'Unit 06' and of that anticipated by the indicated framing members in the area over the 'Entry' and stairs on sheet 'S6'. This area appears to have been shown incorrectly on the structural drawings. Corrections have been made to main floor above framing plans. On sheet A07 — Second Floor Right: 6. Second Floor Plan —Right - Indicate on the plans the required safety glazing for the windows marked 'C1' in 'Bath #1' of 'Unit 04' and in 'Bath #1' of 'Unit 05' per IBC 2406.4.5 and IRC 308.4.5. Window schedule has been updated to require safety glazing at window type C1. On sheet A08 — Third Floor: 7. Third Floor Plan — Left— Change on the plans the elevation callout for the 'Front Elevation' from '15/A17' to '1/Al2'. Elevation callout has been corrected on sheet A08. 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 • wwwmattenbarger.com On sheet A11 — 2nd & 3rd Floor Reflected Ceiling: 8. Second Floor Reflected Ceiling Plan a. Indicate on the plans the required minimum exhaust ventilation for 'Bath #1' of 'Unit 04'. 'Unit 05'. 'Unit 07, and 'Unit 08' per IMC Table 403.3 and IRC M1507.4. Minimum cfm requirements have been added to the plans at bath fans. b. Indicate on the plans the required carbon monoxide alarm in 'Unit 06' per IBC 908.7 and IRC R315.1. Carbon monoxide detector requirement added to floor smoke detector at unit plan 'B', second floor location. On sheet Al2 — Exterior Elevations: 9. Front Elevation — Change on the plans the 'mark' for the aluminum gutter/downspout from 'J' to 'B'. Callout on sheet Al2 has been corrected. 10. Keynotes — Crawl Space Venting a. Eliminate from the plans the specified vent location at the building corner per the referenced code section. The requirement to place an opening for under floor ventilation with 3' of the building corner does not appear in Section R408.1 (or elsewhere) in the 2012 IRC. Note removed. Crawl space venting calculations revised to 1 SF / 300 SF per R408.1 requirements. b. Indicate on the plans the required installation of a 'radon vent' when the installed openings for under floor ventilation are less than 1/300 of the underfloor area per IBC 1203.6.2.2 and IRC R408.2. Crawl space venting calculations revised to 1 SF / 300 SF per R408.1 requirements, therefore radon venting not required. On sheet A13 — Exterior Elevations: 11. Keynotes — Crawl Space Venting a. Eliminate from the plans the specified vent location at the building corner per the referenced code section. The requirement to place an opening for under floor ventilation with 3' of the building corner does not appear in Section R408.1 (or elsewhere) in the 2012 /RC. Note removed. Crawl space venting calculations revised to 1 SF / 300 SF per R408.1 requirements. 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0806 • FAX (425) 453-4772 ® www.wattenbarger.com b. Indicate on the plans the required installation of a 'radon vent' when the installed openings for under floor ventilation are less than 1/300 of the underfloor area per IBC 1203.6.2.2 and IRC R408.2. Crawl space venting calculations revised to 1 SF / 300 SF per R408.1 requirements, therefore radon venting not required. On sheet S4 — Foundation Plan: 12, Foundation Plan - Indicate on the plans the required construction to support the load below the 'plan east' end of 'Beam 1-11'— 5-1/8x9 GLB 24F -V4 — in 'Unit 06'. On sheet S6 — Main Floor Shearwalls & Framing Above: 13. Main Floor Shearwalls & Framing Above a. Clarify on the plans the callout for the 'HDR' - (2)2x6 beam - over the 'plan north' window in 'Bath #1' of 'Unit 06'. It appears to be over spanned and fails in bending and in shear. b. Clarify on the plans the callout for the 'HDR'- (2)2x6 beam - over the 'plan south' door in the 'Entry' of 'Unit 06'. It appears to be over spanned and fails in bending. Beam calculations for 'Beam 1-17' could not be found among the submitted construction documents. c. Clarify on the plans the callout for 'Beam 1-10'— 4x8 - over the 'plan north' windows in the 'Dining' areas of 'Unit 04'. 'Unit 05'. 'Unit 07; and 'Unit 08'. It appears to be over spanned and fails in bending. The loads from the 'upper' roof do not appear to have been accounted for in the provided structural calculations. d. Indicate on the plans the required construction to support the load below the 'plan west' end of 'Beam 2-3'— 5-1/2x9 GLB 24F -V4 — in 'Unit 06'. e. Clarify the difference in the representation of a fireplace in the 'Living Room' of 'Unit 07' and of that on sheet 'A04'. On sheet S7 — Main Floor Shearwalls & Framing Above: 14. Main Floor Shearwalls & Framing Above - Clarify the difference in the representation of a fireplace in the 'Living Room' of 'Unit 05' and of that on sheet 'A05'. On sheet S8 — Upper Floor Shearwalls & Framing Above: 15. Upper Floor Shearwalls & Framing Above - Clarify on the plans the callout for the 'HDR' - (2)2x6 beam - over the 'plan south' window in the 'Living Room' of 'Unit 06'. It appears to be over spanned, fails in bending and in shear, and deflects beyond that permitted per IBC Table 1604.3 and IRC Table R301.7. 2100 112th Ave NE Suite 100 ® Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 • www.wattenbarger.com Sincerely, Travis McDanold, AIA Wattenbarger Architects Cc: Pacific Ridge Homes File 2100 112th Ave NE Suite 100 • Bellevue, WA 98004 • (425) 453-0606 • FAX (425) 453-4772 • www.wattenbarger.com