Loading...
Response to Corrections.pdf RESPONSE TO CORRECTIONS ISSUED 04.20.16 City of Edmonds Andy Gahan, PE Project #: BLD2016-0312 Address: 8219 200th St. SW. CORRECTIONS Sheet A1 under ÅENERGYÆ legend. Option 5a has been chosen - high efÐciency 1. water heater; Rinnai R75-LSi; min. EF .62. 2. Sheet A2.1. Smoke detection and CO2 detection is shown inside and outside of the lower Ñoor addition. All other dwelling rooms shall be veriÐed as having hardwired smoke detection per IRS R314. 3. Sheet A2.1. Shown under the same ÅENERGYÆ legend. Carbon monoxide detection shall also be required per IRC R315. 4. Sheet A1. Whole house ventilation achieved by integration of ventilation with forced air furnace per IRS M1507.3.1. 5. Sheet A2.1. The relocated walls between the garage and remodeled bath shall be Ðre rated per IRC R302.6 (1/2Æ GWB on garage side) and Ðre protected per IRC R302.5 (self closing 20 minute Ðre rated door, 1.375Æ minimum thickness. 6. Sheet A2.1. The lower Ñoor addition has been correctly relabeled as a ÅBedroomÆ. 7. Sheet A2.1. The north wall of the addition has been changed from a 2x4 wall to a standard required 2x6 wall and will be insulated to R-21. END OF CORRECTIONS From: Barry Senter (Applicant) 206.784.2597 barry@barrysenterdesign.com