Loading...
RESPONSE TO ENG 2 COMMENTS.pdfOMEGA ENGINEERING, INC. December 12th; 2017 City of Edmonds Engineering Division Mitch Boyd RE: Correction Letter for Hung Mobile Dear Staff, 2707 Wetrnore Avenue Everett, WA 98201 t 425.387.3020 f 425.259.1958 RtsVs DEC 14 201� BnIcniN � C"y OF EDMONL), This letter is intended to summarize the changes made to the engineering package submitted for the 2nd permit review for this project. This letter addresses comments from the Engineering Division which were provided via email. I have tried to format this letter to match the comment letter for easier understanding. Drainage and Utility Plan 23) The water service note with reference to the AVB has been removed from thr Drainage and Utility Plan. 24) The proposed yard drain has been removed from the design. 25) The invert elevation of the stormdrain has been added for the connection at the west side of the house. 26) The storm service has been rerouted to tap into the storm drain main within 223rd Street SW. 27) The client will provide a right-of-way application at the time of resubmittal. Thank you for taking the time to review the revised plans and report for this project. Please feel free to contact me with any questions you may have. Sincerely, Christopher A. Bydlon E. LT