Loading...
Response to Eng Comments 1.pdf6505 216 th Street SW, Suite 200 Mountlake Terrace, WA 98043 1425) 741-1200 / fax (425) 741-1201 DATE: 28October 2O14 AHlb TO: Jeanie McConnell City ofEdmonds Engineering Program Manager 121 5th Ave N Edmonds, VVA0802O FROM: Nicholas King Emerald City Engineers, Inc. 650521GUhStreet SW, Suite 200 Mountlake Terrace, VVA08O43 PROJECT: PostOffix»-P|umbi 13O2nd Ave N Application #:bN2U14OA43 Emerald City Project Number: 2071-004 SUBJECT: Edmonds Post Office Engineering Plan Check Correction Plumbing Responses SUMMARY: The purpose of this memo is to provide narrative responses to plan check review comments. Emerald City Engineers responses hocomments are inbold print. 1) Please include edetail inthe plan set for the oil/water eeperotor. Sheet P2.0 i 1) This plan sheet indicates the footing drain lines will pump tVarain leader line. The rain leaders connect to a storm detention system on the exterior of the building and that system was not designed to accept flows from the foundation drains. The civil construction plans indicate o separate drain pipe will be stubbed into the SW corner of the building specifically for connection of the footing drains. Please revise the plans to clearly indicate connection to the correct pipe system. The pipe that connects the pump tothe rain leader line has been removed and mnew line has been added that runs parallel tothe rain leader line that connects tothe southwest part ofthe building where Civil is showing the stub connection for the footing drain. 2) This plan sheet also indicates a 4" CW stub into the building, which is accurate for the fire line but not for domestic service. Thedomasticuemioeioahovvntnbea2^|ineoocwrding1otheoivi|oonatruction plans. The City's building division is reviewing this in more detail and will provided comments an needed. END OF MEMORANDUM Page 1 of 'I