Loading...
Response to ENG Comments 1.pdf°F EDMU� CITY OF EDMONDS v ° PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 s� �g9` CityWebsite: www.edmondswa:gov DATE: January 17, 2018 FROM: JoAnne Zulauf Engineering Technician RE: Application #: bld20171768 Project: COE Reservoir Recoating Project Address: 8519 Bowdoin Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Resubmittals can be made at the Development Services Department on the 2"d floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-12pm. City of Edmonds handouts, standard details and development code can be referenced on the City website. 1. Please add address to cover sheet. H DDCmd-'v- 2. On Sheet G-3, please update the version of WSDOT /APWA Standard Specs. 3. Show cell tower and other equipment areas on the tesc/demo plan, sheet C-1 and adjust the location of the silt fence as needed. -�Po a`C- 4. A 100% submittal is required to approve the permit. 5. A Right of Way permit will also be required. Please have the contractor complete a Right of' Way hermit application and return to the City prior to issuance of the building permit.