October 5, 2017
Mitch Boyd
Stantec Consulting Services
Mitch. Boyd(cD-edm ondswa.gov
425.771.0220
Re: BLD2017-0717 — 18109 841" Ave W
Dear Mr. Boyd
This is a reply to the Plan Review Comments, June 26, 2017
General
1 Include construction sequence Refer to sample on City website
Sheet A1.00 has been added.
2 Include General Construction Notes. Refer to sample on City website
Sheet A1.00 has been added.
RESUB
OCT G 2011
BUILDING DEPARTMENT
CITY OF EDMONDS
Per the short plat drainage report (PLN20080030), a maximum of 4,000 SF of impervious area is allowed Per the
impervious area breakdown on the architectural half sheet, the proposed impervious surface is 3,949 SF of impervious
area. Per the drainage report, the impervious surface is 3,192 SF Please clarify the total proposed impervious surface
area and ensure it is below 4,000 SF. Include the impervious area calculation table on the site plan.
The impervious areas are shown on the site plan. The area of new proposed imperious is 3,917 sq. ft.
Site Plan
1. Show filter fence on the plans and reference City standard detail E1.1.
See A1.00 & A1.01, Silt Fence has been renamed Filter Fence on plan.
2. Show construction entrance on the plans and reference City standard detail E1 2
See A1.00 & A1.01
3. Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the
construction site. Incorporate and reference City standard detail E1 3
See A1.00 & A1.01
4. Please provide the location of the temporary stockpile Add a note that the stockpile is to be covered within 24 hours
See A1.01, Note #3 added.
BLD2017-0717 — 18109 84th Ave W
5 Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13.
See A1.01, Note #1 added
6. Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all
other measures that may be required during construction.
See A1.01, Note #2 added.
7. As indicated by the Fire Department, a fire sprinkler system is required for this property.
a Please add a note that a 1" meter is to be installed
b. Please label the pipe material and note tracer wire to be installed on the water service line.
See A0.01, General Note #13 added. See A1.01 for meter, pipe and tracer wire
8. A minimum of 10' of horizontal separation is required between water and sewer lines.
See A1.01, Note #4 added.
9. Show a 6" sewer cleanout at the property line. Please add a note that the 6" cleanout at the property line shall have a 12"
cast iron lamphole cover with 'W hexbolts.
See A1.01, Note #4 added.
10. Show a cleanout located within 2' of the house. Provide the IE of the cleanout.
See A1.01, I added to plan.
IL Provide invert elevations at the cleanout at the property line and at the house so that a minimum 2% slope and minimum
2' pipe coverage can be verified.
See A1.01, cleanout added to plan
12. Show all dry utilities and required utility separation. Please add a note that a minimum of 3' separation is required
between the dry utilities (power, gas, phone, cable, etc.) and wet utilities (sewer, water, and storm).
See A1.01, dry utility area shown to the north of the house.
13. Add a callout to the plans that specifically addresses footing drain discharge location.
Footing drains discharge into storm water system at NW corner of house.
Id. Add a callout to the plans that specifically addresses roof drain discharge location.
Callout added, roof drains discharge into storm water system at NW corner of house.
15. Clarify the "SD" linetype surrounding the house. Is this roof drains or footing drains?
The linetype has been changed to a dashed line, two lines are shown; one a perforated footing drain and a
second downspout leader tightline.
16. Please show the driveway on the plan set and show how the driveway will be graded to have stormwater tributary to the
catch basin. Provide elevation callouts.
The driveway is shown, the driveway slopes to the west and water is captured by a continuous trench drain along
the property line.
17. Please clarify the grading to the south of the proposed structure. Is a rockery/retaining wall being installed? If a wall is to
be installed, please show the footing drain discharge location.
The grading has been changed & the retaining wall has been extended to minimize the slope of the yard. The
drain connects back to the stormwater system at the NW corner of the house.
BLD2017-0717 — 18109 84th Ave W
18. Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds
See A1.01, Note #8
If you have any questions, please do not hesitate to contact us.
SCR I Architects
BLD2017-0717 — 18109 84t" Ave W