Loading...
Response to Eng Comments 1B.pdfDonna Breske & Associates Civil Engineering .......� & Land Use Planning April 26, 2017 City of Edmonds Attn: Engineering Division City Hall - Second Floor 121 5th Ave N Edmonds, WA 98020 21 Ave A, Suite 4 Snohomish, WA 98290 Telephone (360) 294-8941 www.donnabreske.com mmru VdNuaO� ul iap Subject: Request for Additional Information for drainage compliance at 9401 234th St SW (Parcel #27033600109800) Donna Breske & Associates, LLC is in receipt of the City of Edmonds review comments from Mitch Boyd dated 4-11-17. The response to the referenced comments are as follows: Response ponse to Review Comments from City of Edmonds Planiiina and Developnwnt Services: 1. Show footing drain line around perimeter of foundation and speck pipe material, pipe length, invert elevations, and pipe slopes. Response: A footing drain exhibit has been added and shows she footing drains with pipe material, length, invert elevation, and pipe slope. 2. Revise dimensions of raingarden to equal proposed bottom area of 124 SF. Response: Raingarden dimensions have been revised to equal proposed bottom area. 3. Show proposed drain line for the modular block wall including pipe size, pipe material, pipe lengths, pipe slope, and proposed outfall. Response: The proposed drain line for modular block wall has been shown with pipe size, material, lengths, slope, and proposed outfall. 4. Specify sediment controls to be used to meet Element #4 of the SWPPP and provide standard details. Response: Sediment controls to be used to meet Element #4 of the SWPPP and provide standard details have been provided. 5. A silt fence is required. Show location of silt fence on plans and provide standard details. Response: Silt fence and standard details have been shown. 6. Contractor shall maintain access to adjacent properties via the private lane. Provide onsite construction entrance so that trucks can stage off of the lane for loading. Provide standard detail for construction entrance, standard detail E1.2. Response: Onsite construction entrance and standard detail has been provided. 7. Show fencing around proposed bioretention area and do not allow compaction of proposed bioretention area. Response: Fencing around proposed bioretention area has be shown. 21 Ave A, Suite 4 Snohomish, WA 98290 Telephone (360) 294-8941 www.donnabreske.com 8. Show existing sanitary sewer line for existing residence to the east. Response: Existing sanitary sewer line for existing residence to the east has been provided. 9. Show the invert elevation of sanitary sewer line at north EX SSMH. Response: Invert elevation of sanitary sewer line at north EX SSMH has been shown. 10. SSpecijy proposed sewer pipe material. Response: The proposed sewer pipe material has been specified. 11. Sped sewer invert elevation at connection to main, property line and within 2 feet of house. Response: Sewer invert elevations have been provided. 12. Show sewer cleanout locations at property line and within 2 feet of house. Response: Sewer cleanout locations have been shown. 13. Change the line type for the proposed 8" sewer line between the two existing SSMHs and label the sewer line with pipe size, pipe material, invert elevations, and pipe slope. Response: Line type for 8" sewer line between the two existing SSMH has be changed and labeled. 14. Fire sprinkler system requires a 1 " meter and 1.5" service line. Correct water meter size, service size and service provider on sheet 3. Response: Water meter size, service size and service provider has been corrected. 15. Show proposed water main tap location, proposed disturbance area for the street cut, and provide a detail for the backfill and restoration of the right-of-way. Please include standard detail E2.3 on the details sheet. Response: proposed water main tap location, proposed disturbance area for the street cut, and detail have been provided. 16. Specify the depth of the water service line. Response: Depth of water service line has been specified. 17. Specify the depth of the proposed sewer service line where it crosses the water service line. Response: 6" side sewer & water service line do not cross. 18. Revise the driveway transition zone detail to specify the final slope of finished grade. Response: Driveway transition zone detail have been revised to specify final slope of finished grade. 19. Speck the rock type and size required for the bioretention inlet and the size of the rock pad. Response: Rock type and size required for the bioretention inlet and the size of the rock pad has been specified. Donna Breske & Associates M..e.... „ ... Civil Engineering & Land Use Planning 21 Ave A, Suite 4 Snohomish, WA 98290 Telephone (360) 294-8941 www.donnabreske.com 20. Based on the minimum dimensions required for the foundation footings and the proposed finished floor elevation, it does not appear that the bioretention pond will be able to collect the footing drain lines. Provide footing drain invert elevations at the house, pipe lengths and slopes and the invert elevation of the bioretention pond inlet and bottom. Response: Footing drain invert elevations at the house, pipe lengths and slopes and the invert elevation of the bioretention pond inlet and bottom have been provided. 21. Based on the minimum dimensions required for the garage slab and drainage, it does not appear that the bioretention pond will be able to collect the garage footing drain lines. Provide footing drain invert elevations for the garage slab, pipe lengths and slopes. Response: Footing drain invert elevations for the garage slab has been provided. 22. Provide copies of the easement for utility installation and access to the proposed residence. Response: Client will provide copies of the easement for utility instillation and access to the proposed residence. 23. Specify proposed restoration of private lane and easement at the end of construction. Response: Proposed restoration of private lane and easement at the end of construction has been specified. 24. Correct the title of sheet 3 from "DETIALS" to "DETAILS. " Response: The title on sheet 3 has been corrected. 25. Olympic View Water and Sewer District (0VWSD) are the purveyors of water and sewer for this property. Please provide written confirmation from them stating they have reviewed the proposal and have no issues with the proposed location of the utilities. Response: The client shall address this item. 26. If the Fire District requires sprinkling in the residence, a larger water meter may be required. Check with OVWSD. Response: A 1" water meter is now shown. 27. Please revise Utility Note to state "All existing and proposed utilities serving the property will be placed underground. " Response: Utility Note has been revised to state "All existing and proposed utilities serving the property are to be placed underground." 28. Show the location where dry utilities will enter the site and where they will enter the house. Response: Location of dry utilities and where they enter the house have been shown. 29. Add the following note to plan stating `All utility separation requirements will be metper industry standards. " Donna Breske 11�Al�i & Associates , � ... ...ro .........e... ......... '+ Civil �.. Engineering & Land Use Planning 21 Ave A, Suite 4 Snohomish, WA 98290 Telephone (360) 294-8941 www.donnabreske.com Response: "All utility separation requirements will be met per industry standards." Has been added to the plan. 30. Please complete and return the attached Special Inspection Agreement for the "soils professional" per note on plan to confirm soil type in trench bottom. Response: To be provided by client. Stormwater Review Comments Minimum Requirement #1— Preparation of Stormwater Site Plan 1. 6" PVC to rain garden has insufficient cover Response: 6" PVC to raingarden now have sufficient cover 2. 6" PVC outlet IE is shown as 379, 20 LF @ 5% the inlet IE calculates to 380. This is above grade at the house. Response: 6" PVC outlet slope has been revised to 2%. 3. Driveway has conflicting drain arrows, IE 4% to the east and unspecified grade to the south. Response: Driveway drain arrows have been revised. 4. Foundation drains are not shown. If connecting to rain garden, suff cient fall is required and rain garden will need to be upsized to accommodate foundation drain. Response: Foundation drains are shown and is connected to new resized raingarden. Minimum Requirement #2 — Construction Stormwater Pollution Plan 1. Provide rock construction entrance. Response: Rock construction entrance has been provided. 2. Grading plans depicts grading across proposed rain garden. Ensure that no heavy equipment may drive over proposed rain garden. Response: Grading plan has been revised so no heavy equipment does not affect the raingardem Minimum Requirement #5 — Onsite Stormwater Management 1. Small Scale PIT: Provide 15 -minute records per DOE SWMMWW. Response: Conrad Elledg, the licensed septic drainfield designer will respond accordingly. Sincerely, Donna L. Breske, P.E. Phone: 425-334-9980