Loading...
RESPONSE TO ENG COMMENTS 3 MITCH.pdfSCRIArchitects 1916 Pike Place, Suite 12-367 Seattle, WA. 98101 206.458.7517 www.scr-arch.com February 5, 2018 Mitch Boyd Stantec Consulting Services Mitch. Boyd(@edrnondswa.gov 425.771.0220 Re: BLD2017-0718 —18111 841h Ave W Dear Mr. Boyd This is a reply to the Plan Review Comments, December 8, 2017 SITE PLAN (1-16) Previously approved RESUB FEB 0 7 201a BUILDING o f EDM NDSNI 17. The invert elevation of the roof stub is 345.30'. The invert elevation of the existing stormwater detention tank inlet in the SW direction is 349.76'. Please clarify how the stormwater will reach the detention tank. The roof drain tightline connects to the stormline that connects to the South stub at 345.30' not the SW stub. See attached short plat information for as -built stub locations. (18) Previously approved. 19. Please extend the footing drains around the entire base of the retaining walls. The footing drains are now shown the full length of the retaining walls. (20-26) Previously approved. BLD2017-0718 — 18111 84th Ave W GEOTECHNICAL PLAN SET 27. Please show the existing storm system within the profile views. The existing storm system has been added to the profile views. 28. Please label the existing rockery alongside the access road. Rockery label has been added. 29. The plan notes that stormwater will be channeled away from excavated slopes. Show the stormwater channel on the plan. Channel shown on plan. If you have any questions, please do not hesitate to contact us. Si Chris Reinhart Principal SCRIArchitects BLD2017-0718 — 18111 841h Ave W