Loading...
RESPONSE TO ENG COMMENTS 3.pdf10001IN I NOVERNON% Jamommumma 01101110 January 8, 2014 Jeanie McConnell, Engineering Program Manager City of Edmonds, Engineering Division 121 5th Ave North, Second Floor Edmonds, WA 98020 C&A Proj # 117-002-14 RE: Harter Residence ADU 9630 238111 St SW - Plan Check #BLD20140871 Response to 3rd Plan Review Comments Dear Ms. McConnell: This letter presents our response to the Engineering Division Plan Review Comments for the subject project dated January 7th, 2015. The responses below correspond to each of the comments in the January 7th letter. ENGINEERING DIVISION COMMENTS Thank you for relocating the infiltration system into a location with suitable soils. The proposal includes 4 trenches side by side, each 2 -feet in width. City handout E72B - Low Impact Development Stormwater BMP's states "One pipe per trench. If multiple trenches are used, the spacing shall not be closer than 10 -feet, measured on center". According to the City's stormwater engineer, more recent guidance would allow for trench spacing at 6 -foot on center. Alternatively, the infiltration system could be modeled by an engineer as an 18'x8' facility to confirm that it meets standards. Please revise and resubmit plans and documents accordingly. Response: The trenches have been located with increased spacing - 6'0.C. spacing has been provided peryour comment above. We trust that our revisions addressed your comments. We have submitted revised plans for your approval. If you have any questions regarding this response, please call me at (206) 484- 3495. Regards, Cecil & Associates, tes, LLC Roger J. Cecil, P.E.