Response to Eng Comments.pdfDonna Breske 21 Ave A, Suite 4 ,.& Associates Snohomish, WA 98290 Telephone (360) 294-8941 .......� ...e...w,., Civil Engineering & Land Use Planning www.donnabreske.com June 7, 2017 RESUB City of Edmonds JUN 1) 2017 Attn: Engineering Division Cit Hall - Second Floor � N I�t rY � � � 1�t.� fo to t t4t�� �t" 121 5th Ave N Edmonds, WA 98020 Subject: Request for Additional Information for drainage compliance at 7605 206th St SW (Parcel #00641500000700) Donna Breske & Associates, LLC is in receipt of the City of Edmonds review comments from Mitch Boyd dated 6-5-17. The response to the referenced comments are as follows: Response to Review Comments from Cit of Edmonds Planning and Development pent Services: Sheet 1 of 3 -SITE PLAN, & DRAINAGE 3. Please provide the invert elevation of the modular block wall footing drain at the modular block wall and at the discharge location. Response: Invert elevations of the modular block wall footing drain at the modular block wall and the discharge location have now been provided. Sheet 3 of 3 -NOTES AND DETAILS 22. Please provide copies of the easement for utility installation and access„ Response: To be provided by client. 25. Please provide written confirmation from OVWSD. Response: To be provided by client. 30. Please complete the Special Inspection Agreement Response: To be provided by client. ADDITIONAL COMMENTS 31. A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Response: A Stormwater Covenant to be provided by client. 32. Provide the drywell inlet IE to verb slope for footing drains Response: drywell inlet invert elevation to verify for footing drains have now been provided. Donna Brew Associates� ,o.......o .... �...... Civil Engineering & Land Use Planning 21 Ave A, Suite 4 Snohomish, WA 98290 Telephone (360) 294-8941 www.donnabreske.com 33. The SD between the bioretention and the house does not have appropriate cover. The finished grade at the house is approximately 379 and the IE of the SD is 378.9. Please revise. Response: Storm drain between bioretention and the house has been revised to show appropriate cover. 34. Please remove the silt fence in front of the construction access. Also, silt fence is not required upstream of the property (along north and west property lines). Response: The silt fence is along the south property line. The zig-zag linetype is the clearing limits of the project. 35. Please provide a north arrow and scale on all drawings. Response: North arrow has now been provided on all drawing sheets. 36. Please relocate the inlet IE callout on the bioretention detail. Response: The inlet IE callout on bioretention detail has been relocated. 37. Provide proposed grades. Ensure the proposed grades are of a different linetype than existing grades. Response: Proposed grades have been provided and have a different linetype then existing grades. 38. Please relocate the proposed water service connection point. The water service currently connects into a proposed post. Response: Proposed water service connection point has been relocated. Stormwater Review Minimum Requirement #5 — Onsite Stormwater Management 1. Small Scale PIT: Provide 15 -minute records per DOE SWMMWW. This comment has not been addressed. Response: A report dated 12-28-17 from Conrad Elledge, septic drainfield designer was e-mailed to Mithc Boyd on 6-8-17. This should address the review comment. Sincerely, Donna L. Breske, P.E. Phone: 360-294-8941 Infiltration Test #2 Results (Required if performed April through October — see step 4 above) Table 1 (15 -min) Table 2 (30 -min) ble 3 (60 -in) Time oepthof infiltration Time Depth of Infiltration T1 m a TaDepth of Inmfiltration (15 -min) i Water Rate (30 -min) Water Rate (60 -min) Water Rate �inches� lies) (Imir) i Whit— . ... ... The lo,",est infiltration rate from the tables above r) h r ([deasured infiltration rate) /f the IOWeSt Measured infiltration tate is less than the minimum t -ate associated with an infiltrat,or, B114P That 'P (see Tab/e 4 beiow), that BA4 cannot be used � oo rales Ytr inf,"Itratior. BAIIPs� no further investigation measui-ectinfiltration rate is Fess than ail minit-run! irivestigation is required. Design infiltration rate = Pleasured infiltration rate x 0.5 . . .... . ..... ... SIGNATURES ARE REQUIRED I certify that I have folio -wed the procedures outiined in this document to determine the infiltration B11,11D feasibility and infiltration rate. Infiltration Test performed by: Print Name Date Signature "'4 Subsurface investigation performed by: Print Name Signature Date INFILTRATION TEST RESULTS AND CERTIFICATION 3, Infiltration Test #1 Results Table #1 Table 2 (30 -min) Table 3 (60 -min) Time Depthof Infiltration Time Depth of infiltration Time Depth of Infiltration (15 -min) Water Rate f (30 -min) Water Rate 1I60 -nen) Water Rate in (in (inches) ............. - 12 12 Infiltration Test #2 Results (Required if performed April through October — see step 4 above) Table 1 (15 -min) Table 2 (30 -min) ble 3 (60 -in) Time oepthof infiltration Time Depth of Infiltration T1 m a TaDepth of Inmfiltration (15 -min) i Water Rate (30 -min) Water Rate (60 -min) Water Rate �inches� lies) (Imir) i Whit— . ... ... The lo,",est infiltration rate from the tables above r) h r ([deasured infiltration rate) /f the IOWeSt Measured infiltration tate is less than the minimum t -ate associated with an infiltrat,or, B114P That 'P (see Tab/e 4 beiow), that BA4 cannot be used � oo rales Ytr inf,"Itratior. BAIIPs� no further investigation measui-ectinfiltration rate is Fess than ail minit-run! irivestigation is required. Design infiltration rate = Pleasured infiltration rate x 0.5 . . .... . ..... ... SIGNATURES ARE REQUIRED I certify that I have folio -wed the procedures outiined in this document to determine the infiltration B11,11D feasibility and infiltration rate. Infiltration Test performed by: Print Name Date Signature "'4 Subsurface investigation performed by: Print Name Signature Date