Loading...
Response to ENG.pdfDate: To: From 20 10/20/17 Mitch Boyd, Santec Consulting Services Chris Conley, Homeowner 1006 Olympic Avenue, Edmonds WA, 98020 Response to plan review comments dated October 5, 2017 Application BLD2017-1329 Please find below my itemized responses to the plan review comments. RESUB OCT 13 2017 BUILDING DEPARTMENT CITY OF EDMONDS 1. Show filter fence on the plans and incorporate and reference City standard detail El. 1. Response: Per our email correspondence on 10/19/17, 1 have depicted the filter fence location on the Site Plan, Sheet 1. Additionally, I have added Note 3 to the Site Plan General Notes on new Sheet 1.5. 1 have also included City Standard Detail E1.1 on new Sheet 12. See Revision Record (Sheet 0), items 3, 4 and 9. 2. Label construction entrance on the plans. Response: I have indicated the construction entrance on the Site Plan, Sheet 1. See Revision Record (Sheet 0), item 3. 3. Please add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Reference City standard detail El. 3. Response: I have added Note 4 to the Site Plan General Notes on new Sheet 1.5. 1 have also included City Standard Detail E1.3 on new Sheet 13. See Revision Record (Sheet 0), items 4 and 10. 4. Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13. Response: I have added Note 5 to the Site Plan General Notes on new Sheet 1.5. See Revision Record (Sheet 0), item 4. For my project, I believe the practical application is to 1) leave undisturbed native vegetation and soil, and protect from compaction during construction, 2) ensure not to remove native grass, top soil or sub -soil in excess of that necessary for my post footing foundations, and 3) to re -use the removed material, mixed with compost, in my planting beds. Please let me know if you have any questions or if I may be of further assistance. Regards, Chris Conley conley_chris@outlook.com