Loading...
Response to Engineering Comments 2.pdfDATE: August 19, 2016 CITY OF EDMONDS PLAN REVIEW COMMENTS TO: Robin Kearsley r@kearsleyhomes.com ENGINEERING DIVISION (425)771-0220 City Website: ww,www. e atnwxv),d Wa&ii FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20160179 Project: Therrell - Single Family Residence Addition Project Address: 8609 Talbot Rd (""rr'y Fob During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Comments 1 — March 30, 2016 Comments 2 —August 19, 2016 1) August 19, 2016 — Sewer line from house to main line has not been shown on the plans. Please revise by redlining existing plan sheets or submitting new. t ,0 3/30/2016 comment - Show location of existing utilities on the site, including water, sewer and (' storm (if any). The following sanitary side sewer asbuilt was found within City records: fi 2) ok 3) ok 4) August 19, 2016 — The plans have been revised to include additional impervious surface area. The proposed impervious area for the project appears exceed 2000sf and therefore, S stormwater management shall be provided. `, i1'-. a. Update the impervious surface area classification worksheet I k' b. Update the impervious surface area calculations shown on the plans to show all new impervious areas and existing pervious deck conversions to impervious. Credits for the removal of existing impervious areas are not granted if the existing structure is removed. 4t,-o1ZZ4tFs<k(. c. Provide infiltration testing per City HandoutE,72B. d. Include infiltration trench sizing calculations consistent with t'i Handout iE°72.1.1. e. Clearly show how runoff from driveway will be collected and discharged to the infiltration system. If the runoff from the new driveway area cannot be separated from the existing driveway, then the infiltration system will need to be sized to accommodate all runoff directed to the trench. Page 2 of 2