RE: Engineering Division Plan Review
Permit Application BLD2015-0228
WinCo Foods Store No. 136
21900 Highway 99
Edmonds, WA 98026
Dear Chris:
^ f6�!-nyllWll'("16T
P
We appreciate your time in reviewing our plans and providing your comments on March 16, 2015. Please
see our response below and the attached, revised, drawings and supplementary documents. Let me know
at your earliest convenience if you have any questions or need any additional information.
1) Please provide the Permit Coordinators ivith a Traffic Impact Analysis Worksheet (handout E82
attached). Please fill out the first section and answer questions 1& 7.
Response: See attached Traffic .Impact Analysis Workshect.
2) Please provide Civil plans as referenced in Sheet F0.0, or update Sheet SD2 to include the
follotiving.
Response: Civil plans have not been done for this project given the very limited site work scope.
Attached sheet F0.0 has been updated to reference sheet SD2. Attached sheet SD2 has been
updated to include the following, existing, site items: catch basins, sanitary sewer manholes,
water meter, water easement, fire hydrants.
3) Within the civil plans, please shoiv the proposed 8" water inain.
Response: Attached sheet SD2 has been updated to show existing water meter and existing water
easement.
4) Please show within your cavil plans the stornntvater system and catch basins ivithin the property
lines.
Response: Attached sheet SD2 has been updated to show existing catch basins
S) Please provide the note (on the civil plans): Filter socks will be placed in catch basins within
project vicinity as needed per Edmonds Standard Detail E1.3.
l i 1Eii- 1 ( 04 ooh S sf r-r'I t,(aitP 201
f rz I irahc 8 S /o? )of" 2`.�8 (, I'_}1) ( f 1ot3 1'i 11 (' I (('
Response: Keyed Note #51 "(E) STORM WATER CATCH BASIN, ADD FILTER SOCK, AS
NEEDED, PER CITY OF EDMONDS STANDARD DETAIL E1.3", on sheet SD2, has been
created.
6) Please shoiv within your civil plans the side sewer line and clean outs from the structure to the
sewer nrairr.
Response: Attached sheet SD2 has been updated to show known sanitary sewer cleanouts that we
have in our ALTA survey.
7) Please show on the civil plcnrs the water service line fr•orn water meter at the right of way to the
structure.
Response: Attached sheet SD2 has been updated with the Existing Water Easement and Existing
Water Meter.
We have addressed all of your comments and hope that approval for permit will be granted upon receipt
of this letter with attached, revised, drawings and supplementary documents. Please do not hesitate to
contact me with any additional questions or concerns.