Loading...
Response to Fire 1 Comments.pdfC � ENGINEERING May 14, 2018 civil & structural engineering & planning RESUB MAY 15 2018 BUIWING DEPARTMENT CITY OF EDMONDS Karl Fitterer, Deputy Fire Marshal City of Edmonds Development Services, Dept. of Fire Prevention 121 5th Avenue N Edmonds, WA 98020 RE: Application #: Project Name: Project Address Dear Mr. Fitterer, BLD20171841 Graphite Art Studios 202 Main Street Itemized below is our response to the review comments in the February 8, 2018 letter for the above referenced project. Our response appears in bold. 1. FDC needs to be moved toward the curb and not on the building. Revised as noted. 2. Deferred Fire Alarm and Fire Sprinkler permits. Noted on C4.1 3. No PIV is required. PIV removed If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, CG Engineering Greg iiIIen, PE, SE Principal 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com