Loading...
RESPONSE TO FIRE COMMENTS.pdf("f-- "Z115 - yt,t 1/0-0 t ", � 1-(s March 30, 2015 Mr. John Westfall Deputy Chief — Fire Marshal City of Edmonds 121 5"' Ave. North Edmonds, WA 98020 RE: Fire Division Plan Review Permit Application BLD2015-0228 WinCo Foods Store No. 136 21900 Highway 99 Edmonds, WA 98026 Dear John: "NTY We appreciate your time in reviewing our plans and providing your continents on March 11, 2015. Please see our response below and the attached, revised, drawings and supplementary documents. Let me know at your earliest convenience if you have any questions or need any additional information. 1) SD2: Callout fire hydrant locations and status here, or on civils. Response: Fire Hydrants are called out on attached sheet SD2 with keyed note #29, "(E) FIRE HYDRANT TO REMAIN." 2) SD2: Callout "refresh fire lanae striping" here, or on civils. Response: We have added keyed note #19, "REPAINT CURB W/ TWO COATS RED TO MATCH EXTENT OF (E) FIRE LANE"; and keyed note #20, "PAINT `NO PARKING FIRE LANE' W/ TWO COATS TRAFFIC YELLOW TO MATCH SIZE AND LOCATIONS OF (E)." on attached sheet SD2. 3) Provide hazardous niaterial inventory statement (HMIS) for ongoing store inventory limits of hazardous products, hazardous materials and flammable & combustible liquids. Include cooking oil storage for SERVICE DELI. Response: HMIS to follow shortly 4) FP -1: Provide description and detail for HAZARDOUS MATERIALS STORAGE RACK at match line J-7.2 Response: See attached Consumer Product Waste Program 5) FP -1: Noted additional sidewalk provided to public way fi•orn EXIT I00A, thanks. Response: New sidewalk denoted on attached sheet SD2, keyed note #12 6) FP -1: Provide specifications for cart charger (match line C-9.5) and forklift charger it hi I 11,e hi f r f i c, H, 04 -w()u111 8 ,11,i7e,I I ni f(a 1()1 ho i "e, idah(, I 11 x0 I (i 208 2')8.61 0 V i 20£3 258 6'166 7) FP -1: Provide specifications & fuel storage capacity for diesel generator. Response: See attached cut. sheet and installation manual 8) FP -3: Clarify EQUIPMENT/FIXTURE SCHEDULE for• BUILDING/RECEIVING indicates 120 gallon propane fuel for generator & GENERAL NOTE 3. Response: See attached sheet FP3. General note #3 was removed as well as propane tank removed from schedule as there will not be a propane tank at this store. 9) A2: Demarcate floor surrounding fire sprinkler riser area minimum 3' radius fi•orn riser and fire protection equipment with yellow floor paint (match line J-6.9). Response: Keyed note #72, "PAINT 2 COATS TRAFFIC YELLOW STRIPING ON THE FLOOR AROUND FIRE SPRINKLER RISER AND FIRE PROTECTION EQUIPMENT TO AN EXTENT OF 3' ON THREE SIDES", has been added to the FLOOR PLAN on attached sheet A2. 10) A4: FRONT ELEVATION existing Knox box will remain. Contact fire marshal early in project to open box and preser ve box for re -installation at approved location. Response: Keyed note #25, "( E) FIRE DEPT. KEY BOX WILL REMAIN. CONTACT FIRE MARSHAL EARLY IN PROJECT TO OPEN BOX AND PRESERVE BOX FOR RE- INSTALLATION AT APPROVED LOCATION", has been added to the Front Elevation on attached sheet A4. I1) A4: REAR ELEVATION: Add Knox box at DOOR 126D for fire control access (key note #27). Response: A knox box, called out with keyed note #27, has been added between man door #126D and overhead door #126E, on the Rear Elevation, on attached sheet A4. 12) A20: Provide comrrrents to consideration of high rack combustible storage and fire protection design requirements. Are "in -rack" sprinkler provisions indicated: why, or why not! Response: Sprinkler system design provisions are indicated on sheet FO and sprinkler system is designed for 20' Rack Storage of Class IV commodities. The ceiling sprinkler system design density (.80 gpm/ft2) provided is adequate per NFPA 413 so that in -rack sprinklers are not required. 13) A24: Provide building address "21900" 0eivable ftorn Highway 99 frontage on contrasting background. Response: Sheet A4, keyed note #14 has been modified to include text "CONTRACTOR SHALL COORDINATE SIZE, TYPE AND LOCATION WITH LOCAL AUTHORITIES FOR APPROVAL AND FINAL INSPECTION." 14) A24: Provide: "'FIRE PROTECTION CONTROLS" or approved language on sign for DOOR 126A. 12 "x12 " minimum sign on red reflective stock and white letters. Response: Sign ES 147 has been added to the INFORMATION SIGNAGE SCHEDULE on attached sheet A24; Also, note "INSTALL SIGN ES 147 ON EXTERIOR SIDE OF DOOR, RE: A23" was added to door 126D on attached sheet Al2. lio(1y I(,,-uiti,(-, II(� � /,01, ,(�i-a1I8 sf((��1 ( "(IIIe 201 Yb. ,c 1,, ( Ei'170) 1 ) 208 2')8 1':i0 ( f 20E3 2,18 6'1() 15) F0.0: FIRE SPRINKLER PLANS FOR REFERENCE ONLY, SEE SEPARATE PERMIT FOR APPROVED INSTALLATION. Response: Agree that plans are for reference only. Separate permit and submittal for the fire sprinkler system will be provided including detailed shop drawings, calculations and product data for material used. 16) F0.0: Reference site plan indicates new 8"fire main. Callottt engineering details on civil plans. Response: There will not be a new 8" fire main. The new 8" fire main was called out in error on sheet F0.0. The site plan reference has been corrected to indicate existing 8" fire service. This revision will be included in the separate submittal for the fire sprinkler system permit. Civil plans were not done for this project due to the very limited site work scope. 17) F3, MI & Ml.l: Duct smoke detectors connected to building fire alarm system. Response: The duct smoke detectors are connected to the building fire alarm system and are indicated on the fire alarm drawings which will also be submitted under the separate permit for the fire alarm system. Attached sheet M1, keyed note #17, and attached sheet M2,keyed note #11, have been revised to indicate that all duct detectors will be interfaced with fire alarm system, RE: F2 & F2.1. 18) F3: FIRE ALARM PLANS FOR REFERENCE ONLY, SEE SEPARATE PERMIT FOR APPROVED INSTALLATION FIRE PROTECTION COMMENTS/CONDITIONS Response: Agree that plans are for reference only. Separate permit and submittal for the fire alarm system will be provided including detailed shop drawings, calculations and product data for material used. 1.9) Fire District #1 will evaluate the necessity of'Distributed Antenna System (DAS) for emergency communications (IFC 510) when site is available for testing. Additional permit will be required if needed for• DAS system installation. Contact fire marshal early in project. Response: Agree. The building will need to be tested for the necessary emergency communications and DAS system will be submitted for approval if necessary. 20) F3 Fire alarm permit include transmission means other than POTS for monitoring. Response: The fire alarm system as designed utilizes both cellular and IP for monitoring transmission. There are no POTS lines. This will also be included in the separate submittal for the fire alarm system permit. 21) #12 above. Response: See response to comment 12 above. We have addressed all of your comments and hope that approval for permit will be granted upon receipt of this letter with attached, revised, drawings and supplementary documents. Please do not hesitate to contact me with any additional questions or concerns. h h i I[ ,'� ��l I ( I u i I F 1 I1 1, ( t 0 ,() I i 1 l ) 8 " 1 1 0 d 1)o i se 6 i lI111,0 I 3 3 /o) 1) ) o 8 (1 ('I`)i) ( 9` %C; � 1' f 1()6 t10t9,,i "tnti��3� f Respectfiilly, Tristan B. Van Slyke Intern Architect I) h i I I r rth i le,(, y__ P C 01, oII111 f; �,1 i p t 1,<<i f-�, 101 1) o i .I C, i d -IIIc 1 8, 3 !02 ( (r 208 258 6 1 °i0 f , 208 ''' 1', 6 166