Plan Review C-lomments
Date: October -7., 2014
Project Name/Address: Spray Park City Project 600 Yd Ave S
-
Contact Person/Address/Fax: Carrie Hite Parks Department qarrie.hite@edmondswa.,gov
Reviewer: JoAnne Zulauf Division:
11juring review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa
1.gov by choosing Permit Assistance:
Utilit I I iraeer Comments.
Plans
Sheets C2.0 & M4.00 —
o Provide grades so that tank inverts/connection points are known. Detail 2 on M4,00 has dimensions from top of
grade, but site is sloped. At least one NAVD88 reference grade needs to be supplied. Also detail 2 on M4.00 shows
a step between finish grade and the concrete collar, but detail 3 shows it flush. What is the depth of the slab, thi
ckness, etc. so that contractor knows how much concrete to pour, with what dimensions, how to tie it in and what
straps are made of?
RESPONSES:
(Jesse Barksdale, 201/4/10/10) Collar for tank lid should be flush installation. See attached revised M4.00 sheet.
Grades for site will be shown on civil and/or landscape plans, will not be shown on mechanical sheets to prevent
conflicts ofinformation.
Sheet M1.01 —
o Material type for all piping not shown. Please supply so that city can verify that city standard materials are being
used.
RESPONSES:
(,Jesse Barksdale, 2014/10/10) Pipe materials are called OL11 in tl-)(- specifications. Refer to spec section(s) 221113
Facility Water Distribution Piping, 221316 Sanitary Waste and Vent Piping, and 225313 Spray Park Piping for pipe
materials for all systerns sbown on mechanical drawings.
Sheet M2.00 —
o All cleanouts need to have locking lids and be per COE std. E6.2.
RESPONSES:
(Jesse Barksdale, 2014/10/10) Ty1>ical installation detail has bccnadde.d to drawings. ROcr to revised shec( M4 .00
(attached).
DATE FAXED/E-MAII..,ED 11/18/2014 PAGE 1 OF 2
Michele (Mike) F. De Lilla, P.E., LEED AP
Senior Utilities Engineer
Engineering Division I City of Edmonds
121 5111 Ave N. I Edmonds, WA 98020
425-771-0220 x 1320 1 Fax: 425-672-5750
mike.delilla@edmondswa.gov
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.