Response to Leif's Letter.pdfSCRIArchitects 1916 Pike Place, Suite 12-367 Seattle, WA. 98101 206.458.7517 www.scr-arch.com April 16, 2018 Leif Bjorback Building Official City of Edmonds 425.771.0220 RECEIVE 14..b' APR 16 2013 DEVELOPMENT SERVICES COUNTER Re: BLD2017-0717 — 18109 84th Ave W & BLD2017-0718 — 18111 841h Ave W Dear Mr. Bjorback This is a reply to the Email dated April 13, 2018 See attached responses from Lucia Engineering & Robert M Pride, LLC. Hello Chris, In reviewing the comments prepared March 23rd 2018 by Mr. Lucia, it appears the Geotechnical firm of HWA, retained by the city and the Geotechnical firm of Lucia Engineering Inc., retained by you are still in disagreement over the proposed vertical excavation cuts to build the new single family residences at 18111 84th Ave W and 18109 84th Ave W. As stated in the response letter by the HWA, dated March 19th the concern of groundwater should be addressed prior to excavation. This measure will provide guidance and give the ability to avoid unforeseen hazardous situations. It is understood that Mr. Lucia is in disagreement with this statement but the City does feel this is an appropriate precautionary measure if the vertical excavation cuts are to be approved. Mr. Lucia has provided a global stability analysis in response to HWA comments dated March 19th-The report appears to indicate satisfactory conditions but has not yet been reviewed by HWA. To be clear, the City strongly prefers that temporary shoring be accomplished by conventional methods such as the soldier pile wall previously proposed. However if you still wish to proceed with the proposed open excavation plan submitted February 17th, 2018, the following conditions must be met. Review and approval of the Global Stability Analysis by HWA. Provide a groundwater monitoring plan including the installation of drilled monitoring wells in the vicinity of the excavation as well as near the property line of the existing single family residence to verify current water levels and soils conditions prior to excavation. Each of these wells will be required to be periodically monitored during the excavation process. The monitoring reports will need to be submitted to the city for peer review prior to the start of excavation and during the excavation process. If the presence of groundwater is found prior to, or during the excavation, the vertical excavation plan will no longer be valid, and an approved shoring design will be required. A contingency plan to ensure soil stability will also be required if ground water presents itself during the excavation. Please note that the City approval of the exposed excavation approach would be entirely dependent upon the total absence of groundwater. BLD2017-0717 — 18109 841h Ave W & BLD2017-0718 — 18111 84�h Ave W Provide a conditions survey of the structure on the adjacent property along with periodic monitoring reports of the structure's condition and elevations. If any settlement or distress to the adjacent home are found during the excavation, all work must cease. These reports will be required prior to excavation and continue until all the backfilling of the new structures has been completed. • A hold harmless agreement, on a form provided by the City, signed by the property owner and notarized, will be required prior to permit issuance. This agreement will indemnify the City concerning any and all damages as a result of construction activity on the job site. If the applicant does not wish to provide the items listed, a shoring wall designed and sealed by a Washington State licensed Engineer in accordance with the prior geotechnical reports provided will be required. I might mention that the soldier pile wall system that was originally proposed for this project had been previously reviewed and approved during our earlier review. Please advise as to how you wish to proceed. If I can be of any additional assistance please do not hesitate to contact me, or Eric Carter, Plans Examiner. If you have any questions, please do not hesitate to contact us. Sincerely, Chris Reinhart Principal SCR Architects BLD2017-0717 — 18109 841h Ave W & BLD2017-0718 — 18111 84th Ave W LUCIA ENGINEERING INC. COY SCR Architects 41916 Pike Place, Suite 12-367 Seattle, WA 981o1 Attention: Chris Reinhart Reference: Plan Check: BLD2017-0718 Chris EE1EVr=n,', DEVELOPMEN-r SERVICES COUKITER 7307 12th Avenue NE Seattle, Washington 98115 Phone: 2o6.790.8039 April 7, 2018 Project Address: 18111 84th AVE W (Lot #2) City Review & Reply to City E-mail Message Dated April 4, 2018 Attached are the revised excavation plans. 1. I have added details and locations for the monitoring wells now being required by the City. 2. I have added a monitoring program and shown the planned locations for monitoring of the existing house to the south of lot # 2 and east of lot #1. 3. I have also added a soldier pile shoring system to be used should groundwater be encountered. The calculations for this are attached here. I have sent this shoring information the Bob Pride, the Geotechnical Engineer for his review. I must say I am surprised that the City has not responded to any of my comments regarding the HWA Peer review. All of my rebuttal points are valid, yet the City continues to ignore them and pushes for shoring, without substantiating this demand. It is disappointing. Please call me if you have any questions. /Z'�: Joseph M. Lucia, PE Page 1 of 1 Depth(ft) -0 5 MR 15 20 86th Avenue W. Lots 1 & 2 Temporary Shoring 0 1 ksf Moment Equilibrium Force Equilibrium <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltech.com Licensed to Joseph M. Lucia, P.E. Lucia Engineering, Inc. Date: 4/8/2018 File: UNTITLED Wall Height=9.0 Pile Diameter=1.5 Pile Spacing=9.0 Wall Type: 2. Soldier Pile, Drilled PILE LENGTH: Min. Embedment=11.46 Min. Pile Length=20.46 (in graphics and analysis) MOMENT IN PILE: Max. Moment=77.88 per Pile Spacing=9.0 at Depth=14.10 PILE SELECTION: Request Min. Section Modulus = 28.3 in3/pile=464.07 cm3/pile, Fy= 50 ksi = 345 MPa, Fb/Fy=0.66 -> Piles meet Min. Section Requirements: Top Deflection is shown in (in) HP8X36 (1.52) W8X35 (1.43) HP10X42 (0.86) W10X30 (1.06) HP12X53 (0.46) W12X26 (0.89) HP13X60 (0.36) HP14X73 (0.25) W14X22 (0.91) W16X26 (0.60) HP16X88 (0.16) W16X89 (0.14) HP16X101 (0.14) W16X100 (0.12) DRIVING PRESSURES (ACTIVE, WATER, & SURCHARGE): Z1 P1 Z2 P2 Slope 0 0.04 9 0.22 0.020000 9 0.22 40 0.84 0.020000 PASSIVE PRESSURES: Z1 P1 Z2 P2 Slope 10 0 40 15.0 0.5000 ACTIVE SPACING: No. Z depth Spacing 1 0.00 9.00 2 9.00 1.50 PASSIVE SPACING: No. Z depth Spacing_ 1 9.00 3.00 UNITS: Width,Spacing,Diameter, Length, and Depth - ft; Force -kip; Moment - kip-ft Friction, Bearing, and Pressure - ksf; Pres. Slope - kip/ft3; Deflection - in report.out ****************************************************************************** SHORING WALL CALCULATION SUMMARY The leading shoring design and calculation software Software Copyright by CivilTech Software www.civiltech.com ****************************************************************************** Shoring5uite Software is developed by CivilTech Software, Bellevue, WA, USA. The calculation method is based on the following references: 1. FHWA 98-011, FHWA-RD-97-130, FHWA SA 96-069, FHWA-IF-99-015 2. STEEL SHEET PILING DESIGN MANUAL by Pile Buck Inc., 1987 3. DESIGN MANUAL DM-7 (NAVFAC), Department of the Navy, May 1982 4. TRENCHING AND SHORING MANUAL Revision 12, California Department of Transportation, 7anuary 2000 6. EARTH SUPPORT SYSTEM & RETAINING STRUCTURES, Pile Buck Inc. 2002 5. DESIGN OF SHEET PILE WALLS, EM 1110-2-2504, U.S. Army Corps of Engineers, 31 March 1994 7. EARTH RETENTION SYSTEMS HANDBOOK, Alan Macnab, McGraw-Hill. 2002 8. AASHTO HB-17, American Association of State and Highway Transportation Officials, 2 September 2002 UNITS: Width/Spacing/Diameter/Length/Depth - ft, Force - kip, Moment - kip-ft, Friction/Bearing/Pressure - ksf, Pres. Slope - kip/ft3, Deflection - in ----------------------------------------------------------------------------- Licensed to Joseph M. Lucia, P.E. Lucia Engineering, Inc. Date: 4/8/2018 File: UNTITLED Title: 86th Avenue W. Lots 1 & 2 Subtitle: Temporary Shoring **********************************INPUT DATA********************************** Wall Type: 2. Soldier Pile, Drilled Wall Height: 9.00 Pile Diameter: 1.50 Pile Spacing: 9.00 Factor of Safety (F.S.): 1.00 Lateral Support Type (Braces): 1. No Top Brace Increase (Multi -Bracing): Add 15%* Embedment Option: 1. Yes Friction at Pile Tip: No Pile Properties: Steel Strength, Fy: 50 ksi = 345 MPa Allowable Fb/Fy: 0.66 Elastic Module, E: 29000.00 Moment of Inertia, I: 119 User Input Pile: W14X82 Page 1 report.out * DRIVING PRESSURE (ACTIVE, WATER, & SURCHARGE) * No. Z1 top Top Pres. Z2 bottom Bottom Pres. Slope ----------------------------------------------------------------------------- 1 0 0.04 9 0.22 0.020000 2 9 0.22 40 0.84 0.020000 * PASSIVE PRESSURE * No. Z1 top Top Pres. Z2 bottom Bottom Pres. Slope ----------------------------------------------------------------------------- 1 10 0 40 15.0 0.5000 ----------------------------------------------------------------------------- * ACTIVE SPACE * No. Z depth Spacing ----------------------------------------------------------------------------- 1 0.00 9.00 2 9.00 1.50 * PASSIVE SPACE No. Z depth Spacing ------------------------------- 1 9.00 3.00 *For Tieback: Inputl = Diameter; Input2 = Bond Strength *For Plate: Inputl = Diameter; Input2 = Allowable Pressure *For Deadman: Inputl = Horz. Width; Input2 = Passive Pressure; *For Sheet Pile Anchor: Inputl = Horz. Width; Input2 = Passive Slope; ********************************CALCULATION********************************** The calculated moment and shear are per pile spacing. Sheet piles are per one foot or meter; Soldier piles are per pile. Top Pressures start at depth = 0.00 MEMOSEEF13ML11N .. D3=20.46 Page 2 report.out D1 - TOP DEPTH D2 - EXCAVATION BASE D3 - PILE TIP (20% increased, see EMBEDMENT Notes below) MOMENT BALANCE: M=0.00 AT DEPTH=18.55 WITH EMBEDMENT OF 9.55 FORCE BALANCE: F=0.00 AT DEPTH=20.46 WITH EMBEDMENT OF 11.46 The program calculates an embedment for moment equilibrium, then increase the embedment by 20% to reach force equilibrium. A Balance Force=40.02 is developed from depth=18.55 to depth=20.46 Total Passive Pressure = Total Active Pressure, OK! *********************************RESULTS***************************************** * EMBEDMENT Notes * Based on USS Design Manual, first calculate embedment for moment equilibrium, then increased by 20 to 40 % to get the total design depth. The embedment for moment equilibrium is 9.55 * The 20% increased the total design depth is 11.46 (Used by Program) The 30% increased the total design depth is 12.42 The 40% increased the total design depth is 13.38 Based on AASHTO 2002 Standard Specifications, first calculate embedment for moment equilibrium, then add safety factor of 30% for temporary shoring; add safety factor of 50% for permanent shoring. The embedment for moment equilibrium is 9.55 Add 30% embedment for temporary shoring is 12.42 Add 50% embedment for permanent shoring is 14.33 * BASED ON USS DESIGN MANUAL (20% increased), PROGRAM CALCULATED MINIMUM EMBEDMENT 11.46 TOTAL MINIMUM PILE LENGTH = 20.46 * MOMENT IN PILE (per pile spacing)* Pile Spacing: sheet piles are one foot or one meter; soldier piles are one pile. Overall Maximum Moment = 77.88 at 14.10 Maximum Shear = 39.63 Moment and Shear are per pile spacing: 9.0 foot or meter * VERTICAL LOADING * Vertical Loading from Braces = 0.00 Vertical Loading from External Load = 0.00 Total Vertical Loading = 0.00 *****************************SOLDIER PILE SELECTION***************************** Page 3 report.out Request Min. Section Modulus = 28.32 in3/pile = 464.07 cm3/pile, Fy= 50 ksi = 345 MPa, Fb/Fy=0.66 The pile selection is based on the magnitude of the moment only. Axial force is neglected. HP8X36 (English Units): Area= 10.6 in. Depth= 8.02 in. Width= 8.16 in. Height= 8 in. Flange thickness= 0.445 in. Web thickness= 0.445 in. Ix= 119 in4/pile Sx= 29.8 in3/pile Iy= 40.3 in4/pile Sy= 9.88 in3/pile (Metric Units): Ix= 49.53 x100cm4/pile Sx= 488.33 cm3/pile Iy= 16.77 x100cm4/pile Sy= 161.90 cm3/pile Top deflection = 1.521(in) W8X35 (English Units): Area= 10.3 in. Depth= 8.12 in. Width= 8.02 in. Height= 8 in. Flange thickness= 0.495 in. Web thickness= 0.31 in. Ix= 127 in4/pile Sx= 31.2 in3/pile Iy= 42.6 in4/pile Sy= 10.6 in3/pile (Metric Units): Ix= 52.86 x100cm4/pile Sx= 511.27 cm3/pile Iy= 17.73 x100cm4/pile Sy= 173.70 cm3/pile Top deflection = 1.425(in) HP10X42 (English Units): Area= 12.4 in. Depth= 9.7 in. Width= 10.1 in. Height= 10 in. Flange thickness= 0.42 in. Web thickness= 0.415 in. Ix= 210 in4/pile Sx= 43.4 in3/pile Iy= 71.7 in4/pile Sy= 14.2 in3/pile (Metric Units): Ix= 87.40 x100cm4/pile Sx= 711.20 cm3/pile Iy= 29.84 x100cm4/pile Sy= 232.70 cm3/pile Top deflection = 0.862(in) W10X30 (English Units): Area= 8.84 in. Depth= 10.5 in. Width= 5.81 in. Height= 10 in. Flange thickness= 0.51 in. Web thickness= 0.3 in. Ix= 170 in4/pile Sx= 32.4 in3/pile Iy= 16.7 in4/pile Sy= 5.75 in3/pile (Metric Units): Ix= 70.75 x100cm4/pile Sx= 530.94 cm3/pile Iy= 6.95 x100cm4/pile Sy= 94.23 cm3/pile Top deflection = 1.065(in) HP12X53 (English Units): Area= 15.5 in. Depth= 11.8 in. Width= 12 in. Height= 12 in. Flange thickness= 0.435 in. Web thickness= 0.435 in. Ix= 393 in4/pile Sx= 66.7 in3/pile Iy= 127 in4/pile Sy= 21.1 in3/pile (Metric Units): Page 4 report.out Ix= 163.57 x100cm4/pile Sx= 1093.01 cm3/pile Iy= 52.86 x100cm4/pile Sy= 345.77 cm3/pile Top deflection = 0.461(in) W12X26 (English Units): Area= 7.65 in. Depth= 12.2 in. Width= 6.49 in. Height= 12 in. Flange thickness= 0.38 in. Web thickness= 0.23 in. Ix= 204 in4/pile Sx= 33.4 in3/pile Iy= 17.3 in4/pile Sy= 5.34 in3/pile (Metric Units): Ix= 84.90 x100cm4/pile Sx= 547.33 cm3/pile Iy= 7.20 x100cm4/pile Sy= 87.51 cm3/pile Top deflection = 0.887(in) HP13X60 (English Units): Area= 17.5 in. Depth= 12.54 in. Width= 12.9 in. Height= 13 in. Flange thickness= 0.46 in. Web thickness= 0.46 in. Ix= 503 in4/pile Sx= 80.3 in3/pile Iy= 165 in4/pile Sy= 25.5 in3/pile (Metric Units): Ix= 209.35 x100cm4/pile Sx= 1315.88 cm3/pile Iy= 68.67 x100cm4/pile Sy= 417.87 cm3/pile Top deflection = 0.360(in) HP14X73 (English Units): Area= 21.4 in. Depth= 13.6 in. Width= 14.6 in. Height= 14 in. Flange thickness= 0.505 in. Web thickness= 0.505 in. Ix= 729 in4/pile Sx= 107 in3/pile Iy= 261 in4/pile Sy= 35.8 in3/pile (Metric Units): Ix= 303.41 x100cm4/pile Sx= 1753.41 cm3/pile Iy= 108.63 x100cm4/pile Sy= 586.65 cm3/pile Top deflection = 0.248(in) W14X22 (English Units): Area= 6.49 in. Depth= 13.7 in. Width= 5 in. Height= 14 in. Flange thickness= 0.335 in. Web thickness= 0.23 in. Ix= 199 in4/pile Sx= 29 in3/pile Iy= 7 in4/pile Sy= 2.8 in3/pile (Metric Units): Ix= 82.82 x100cm4/pile Sx= 475.22 cm3/pile Iy= 2.91 x100cm4/pile Sy= 45.88 cm3/pile Top deflection = 0.910(in) W16X26 (English Units): Area= 7.68 in. Depth= 15.7 in. Width= 5.5 in. Height= 16 in. Flange thickness= 0.345 in. Web thickness= 0.25 in. Ix= 301 in4/pile Sx= 38.4 in3/pile Iy= 9.59 in4/pile Sy= 3.49 in3/pile (Metric Units): Ix= 125.28 x100cm4/pile Sx= 629.26 cm3/pile Iy= 3.99 x100cm4/pile Sy= 57.19 cm3/pile Top deflection = 0.601(in) Page 5 report.out HP16X88 (English Units): Area= 25.8 in. Depth= 15.33 in. Width= 15.665 in. Height= 16 in. Flange thickness= 0.54 in. Web thickness= 0.54 in. Ix= 1112 in4/pile Sx= 145 in3/pile Iy= 347 in4/pile Sy= 44 in3/pile (Metric Units): Ix= 462.81 x100cm4/pile Sx= 2376.12 cm3/pile Iy= 144.42 x100cm4/pile Sy= 721.03 cm3/pile Top deflection = 0.163(in) W16X89 (English Units): Area= 26.2 in. Depth= 16.8 in. Width= 10.4 in. Height= 16 in. Flange thickness= 0.875 in. Web thickness= 0.525 in. Ix= 1300 in4/pile Sx= 155 in3/pile Iy= 163 in4/pile Sy= 31.4 in3/pile (Metric Units): Ix= 541.06 x100cm4/pile Sx= 2539.99 cm3/pile Iy= 67.84 x100cm4/pile Sy= 514.55 cm3/pile Top deflection = 0.139(in) HP16X101 (English Units): Area= 29.8 in. Depth= 15.5 in. Width= 15.75 in. Height= 16 in. Flange thickness= 0.625 in. Web thickness= 0.625 in. Ix= 1297 in4/pile Sx= 167 in3/pile Iy= 408 in4/pile Sy= 52.1 in3/pile (Metric Units): Ix= 539.81 x100cm4/pile Sx= 2736.63 cm3/pile Iy= 169.81 x100cm4/pile Sy= 853.76 cm3/pile Top deflection = 0.140(in) W16X100 (English Units): Area= 29.5 in. Depth= 17 in. Width= 10.4 in. Height= 16 in. Flange thickness= 0.985 in. Web thickness= 0.585 in. Ix= 1490 in4/pile Sx= 175 in3/pile Iy= 186 in4/pile Sy= 35.7 in3/pile (Metric Units): Ix= 620.14 x100cm4/pile Sx= 2867.73 cm3/pile Iy= 77.41 x100cm4/pile Sy= 585.02 cm3/pile Top deflection = 0.121(in) *********************** LAGGING SIZE ESTIMATION *********************** Max. Pressure above base = 0.22 Piles are more rigid than timber lagging, due to arching, only portion of pressures are acting to lagging, 30-50% loading is suggested. If 50% loading is used for lagging design, Design Pressure = 0.11 Pile Spacing =9.0, Max. Moment in lagging = 1.11 For V x12" Timber, Section Modules 5=23.47 in3. The request allowable bending strength, fb=M/5=0.57 For 6"x12" Timber, Section Modules 5=57.98 in3. The request allowable bending strength, fb=M/5=0.23 Page 6 report.out If 30% loading is used for lagging design, Design Pressure = 0.07 Pile Spacing =9.0, Max. Moment in lagging = 0.67 For 4"x12" Timber, Section Modules S=23.47 in3. The request allowable bending strength, fb=M/S=0.34 For 6"x12" Timber, Section Modules S=57.98 in3. The request allowable bending strength, fb=M/S=0.14 Unit: Pressure: ksf, Spacing: ft, Moment: kip-ft, Bending Strength, fb: ksi Page 7 Depth(ft) -0 .5 10 15 20 Depth(ft) 0 5 10 15 20 86th Avenue W. Lots 1 & 2 Temporary Shoring 0 1 ksf Net Pressure Diagram Max. Shear=39.63 kip Max. Moment=77.88 kip-ft Moment_ Equilibrium Force Equilibrium Top Deflection=0.89(in) Max Deflection=0.89(in) 39.63 kip 0 77.88 kip-ft 0 0.887(in) 0 Shear Diagram Moment Diagram Deflection Diagram PRESSURE, SHEAR, MOMENT, AND DEFLECTION DIAGRAMS Based on pile spacing: 9.0 foot or meter User Input Pile, W12X26: E (ksi)=29000.0, I (in4)/pile=204.0 File: UNTITLED <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltech.com Licensed to Joseph M. Lucia, P.E. Lucia Engineering, Inc.