Response to Planning - Chase Lake Elementary.pdfbassetti
archite, Us /
May 5,2U15
City ofEdmonds
Building review comments
Permit Number 2O15 -0B76
Subject: Chase Lake Elementary Portable classroom Building review response
1. See attached letter from the School District.
2. Additional information about building height has been added to sheets AO.1 and A2,1
a. Datum point has been indicated on A0.1.
b. Height calculations on aheotAO.1 indicate all four points are the same grade.
c. Height calculations on nhaetAO.1 indicate average original grade is the same,
max height is25'and proposed height
d. Elevation 1onsheet A2.1indicate average original grade iothe same and
proposed height.
3. Suuthproparty|inehmoboenindioutudonAU.1ioohovvportab|aim275'-7°fronn
property line.
Sincerely,
Steve Zang /
Project Architect
nColumbia Street, SUM mm/Seattle, Washington omn
103k [Wa
n I �yr PITAL
W1 I �! D SCHOOL DISTRICT PROJECTS
20420 - 68th Avenue West �VIWY j ? 0 V`,J OFFICE
Lynnwood, Washington 98036-7400
LS 425-431-7166�if�f°
DISTRICT
c
Serving the communities and Students ofBtier, Edmonds, Lynnwood, Mountlake Terrace, Woodway andunincorporated
Snohomish County
May 5, 2015
City of Edmonds
Attn: Development Services
1215 1h Ave North
Edmonds, WA 98020
Subject: Necessity of Portable Classroom at Chase Lake Elementary School
To whom it may concern,
In response to the City of Edmonds Municipal Code 17.100 Community Facilities, paragraph L. Schools,
the Edmonds School District has a need for one portable classroom at Chase Lake Elementary School
due to a state mandated reduction in class sizes (student / teacher ratio).
Chase Lake Elementary School has recently been designated as a high poverty school (over 50% free and
reduced lunch). The state guidelines for high poverty schools has an even lower student / teacher ratio
than non -high poverty schools.
In order to successfully accomplish the educational mission and objectives of the District in accordance
with applicable state and federal statues, regulation and guidelines, the District would like to provide
one additional portable classrooms to provide the appropriate classroom space to accommodate
reduced class sizes.
I hope this helps better support the need for a portable classroom. Please don't hesitate with any
questions regarding this matter.
Sincerely,
Matt Finch
Design & Construction Manager
Edmonds School District
Capital Projects Office
o: (425) 431-7167
m OUR MISSION .
To ADVOCATE for all students by PROVIDING a learning environment which EMPOWERS students, staff and the community to MAXIMIZE their
personal, creative and academic potential in order to BECOME lifelong learners and responsible world citizens.