Response to planning comments 1.pdfe4��Spije-, —4v vi t
eiOMEGA� ENGINEERING, INC.
November 3rd, 2016
2707 Wetrmore Avenaae
Everett, W^!94320'1
t 425.387.3820
f 425_259.7 958
Sean Conrad �, �f�o��
Associate Planner RESUB
City of Edmonds
Development Services Department NOV 2016
RE: RE: PLAN REVIEW COMMENTS FOR PLAN ,CHECK #BLD20160875 RIJILUNQ Dt- J ITINIE '
NEW HOUSE LOCATED AT 10114 243RD PL SW 011)" T1s: ° OX)NDS
Dear Sean,
This letter is intended to summarize the changes made to the site plan, as well as, the engineering
package reviewed during the initial permit review for this project by the Planning Division. This letter
addresses comments from you along with other staff members which were provided in a letter dated.
August 12th, 2016. 1 have tried to format this letter to match your comment email for easier
understanding.
Planning Division
1) Site Plan
Height Calculations: Height calculations and elevation points have been added to the site plan in
accordance with the City's Height Calculation Information handout (#1341). Please see the updated
site plan and sheet 1 of the engineering plans.
Setbacks: Per the minimum side yard setback requirement for zone RS -8, the proposed SFR has
been shifted to obtain a side yard setback of 7.5 feet from the east property line. Please see the
updated site plan and engineering plans.
Thank you for taking the time to review the revised plans for this project. Please feel free to contact me
with any questions you may have.
Sincerely,
Rachel A. Jacobs, E.I.T.
Omega Engineering, Inc.