response to planning comments 2.pdfMike Clugston AICP, Associate Planner
City of Edmonds Development Services Department
1215`h Avenue North
Edmonds, WA 98020
RE: SFR at 23920104`h Ave W
Plan Check #111612014-1294
2nd Review Coment Response
RAM Job No. 15-007
Mr. Mike Clgston:
July 6, 2015
This letter outlines the revisions and corrections made per your request of additional information dated July 1,
2015. Below is a list of the comment response documents addressing your comments and request:
1. Clearing/trees: Sheet TP -01 shows the entire eastern portion of the lot to be cleared
and graded and all trees removed. This is not in keeping with ECDC 18.45.050.A and B.
Please revise Sheet TP -01 to show the minimum clearing necessary to complete this
project by moving the location of the proposed stockpile and shrinking the clearing
limits to only those areas that are in the footprint of development. For retained trees
immediately adjacent to areas of clearing, show the drip lines of each tree. Any work
inside the drip lines must take place in accordance with ECDC 18.45.050.H subsections
(l)—(6).
Clearing limits have been adjusted and stock pile relocated as requested. Additional tree protection note
have also been added to the plan for clarification. See updated sheet TP -01.
If there are any questions regarding the items above or the contents of the revised drawings please contact me at
your earliest convenience; I can be reached at (425)678-6960 or RobL@RAMengineeringinc.com. We sincerely
appreciate your time and assistance.
Thank you,
Rob Long, PE
Principal
cc: Kayla Clark, c/o Select Homes, Inc.
RAM Firigi le('t"If` g 16531.13"' Ave W, Suite A108 Lynnwood WA 98037 (4 25 1 678-6960 RAMenginerringinc.com