Loading...
RESPONSE TO PLANNING COMMENTS.pdfJuly 1,2O14 |U| 0� �8�� ��� " ~~ ��� � KernanLien, City ofEdmonds 1Zl5th Avenue North Edmonds, WA 98026 Subject: Swedish ACC Addition — Planning Division - Plan Review Responses Permit: BLD 2014-0238 Below are responses to the second Planning Division review comments prepared June 25, 2014. Corresponding drawings have been clouded with a delta that referenced "Permit Revisions". Slip sheet hardcopies have been provided to replace sheets previously submitted. Please don't hesitate to contact me should additional questions arise. Thanl< you, Rachel Jenner, Project Manager Cc: Bryan Hall mhnMengeduht nonSchnebc|e rv|erxmmvcn xmvpne,ker chock Kolb xnd,i,|apin, z,3YALE AVENUE NORTH SEATTLE xmoo1mn 206ue3 5555 nuuoou^ 2300 "J/0 111,11111111"Off ME Please provide height calculations on the site Refer to AO.20 for height calculations. plan for the proposed Swedish ACC addition consistent with ECDC 21.40.030 and the Note: The other clouds on this sheet are in Architectural Design Board's condition of response to Building Division's non-structural approval Number 1. See Handout B41 for more comments by Beck& Associates, doted June 21, information regarding height calculations. The 2014. height rectangle used to calculate average level must encompass the existing hospital and the proposed ACC addition. Landscaping Cost Estimate: Please provide an See attached landscape and irrigation cost itemized cost estimate covering the cost of the estimate, prepared by Sellen Construction, in landscaping and irrigation. This estimate is used the amount of $224,049. A landscape to determine the amount set for the landscape maintenance bond in the amount of 33,607.35, maintenance bond, which is 15% of the cost will follow under separate cover by the Owner. Please don't hesitate to contact me should additional questions arise. Thanl< you, Rachel Jenner, Project Manager Cc: Bryan Hall mhnMengeduht nonSchnebc|e rv|erxmmvcn xmvpne,ker chock Kolb xnd,i,|apin, z,3YALE AVENUE NORTH SEATTLE xmoo1mn 206ue3 5555 nuuoou^ 2300 Addenda Acknowledged: None DESCRIPTIONITEM Landscape: $160,804.00 * Includes 12" depth imported soil, 2" depth specified mulch, 6" depth 2"-4" Foothills cobble over 12" depth drainrock and 1/8" Steel edger. * Includes all trees, shrubs and groundcover as shown on plans. * All sub -grades to bet set at +/-, 1/10th foot by others free of rocks, straw and debris 2" and 2 Irrigation: P.O. Box 2005 Office (253) 891-9888 * Includes all material and labor to provide a complete system per plan sheets and specifications Sumner WA 98390 Fax (253) 891-9777 including all sleeves. CONT. #GREENE102RC BOND #SRS1016796 • Includes (8) hrs. existing system assessment and (24) hrs. of capping and temporary Swedish Edmonds General Contractor: Sellen Bid Dater 12 -May -2014 Bid Time: @2:OOPM Plan Sheets/Dates: 1-0.01, 1-1.10, L1.11, L1.20, L3.20, L4.10, L4.11, L4.20, L4.21, L5.0, L5.10, L5.11 & Specifications: 32 80 00, 32 90 00 & 32 93 10 dated 14 January, 2014 Architect: Site Workshop Addenda Acknowledged: None DESCRIPTIONITEM Landscape: $160,804.00 * Includes 12" depth imported soil, 2" depth specified mulch, 6" depth 2"-4" Foothills cobble over 12" depth drainrock and 1/8" Steel edger. * Includes all trees, shrubs and groundcover as shown on plans. * All sub -grades to bet set at +/-, 1/10th foot by others free of rocks, straw and debris 2" and 2 Irrigation: $55,104.00 * Includes all material and labor to provide a complete system per plan sheets and specifications including all sleeves. • Includes (8) hrs. existing system assessment and (24) hrs. of capping and temporary reconnection to existing irrigation system to keep operational through construction period. * Excludes water meter, 110 -volt power and connection of irrigation controller. Wire chases / runs and plumbing within building walls. All electrical, inside or outside of building, that requires a permit or installation by electrician. PROPOSAL TOTAL: $215,908.00 STANDARD NOTES: NOM-UNIOAI t, OR C I fs,1567 ,! * Proposal includes Union wages. CD 56i Rgviy wnt5 12 If 1-7 * Proposal includes 3 -mobilizations, additional mobilizations charged at $250.00. _ * This proposal is good for 90 -days and if accepted shall become an attachment to the contract., STANARD EXCLUSIONS: * Taxes, bonds, permits, fees or additional insurance. * Cutting, patching or boring of hard surfaces and any concrete work. * Protection of materials scheduled to remain and replacement of materials damaged by others. * Survey, Traffic control, erosion control, clearing and grubbing, tree removal and demolition. * Protection board, waterproofing, roof or wall penetrations and crane costs (see above). * Maintenance beyond substantial completion of landscape. Dan Wislocker greelte ects®®irr;.ccon Richard Emigholz Construction Manager Construction Estimator Page 1 of 1 GREEN EFFECTS, INC. P.O' Box 2005 Sumner, WA 98390 253.891-9888 Fax: 253-891-9777 Customer Name and Address: Sellen 227 Westlake Ave North Seattle, Wa. 98109 Att: Dan Schebele Changes per CD 6-10-14: Creeei Lftecft Project Name and Address: Swedish Edrnonds ACC 21601 76th Ave West Edmonds, Wa. 98026 Description of Work: tv" Unit Cost: MU Total Cost: Considerable plant changes per plant schedule on sheets 1-5.00 and L5.10 dated 6- 10-14: Adds a total of 2,710 plants of various sizes and lypos. Summary count as follows; Deletes (146) 2g carex didsalea, (14) 3g ilex crenatha, (22) 1g ornphalodes verna, (256) 3g pachistina myrsinites, (2.2)1g polygonaturn odoraturn and (51) 1g asplenitim. Adds (3) 2,6" cornus starlite, (1) 10'metasequola, (1) 3" ulmas chenmoul, (13) Ig asorurn, (4) 29 billardiera, (13) 39 Geanothus Joyce coulter, (5) 6g cephalotaxus harringlonia, (128) 19 geranium macrorrhizum, (2) 29 holboallia, (34) 19 iris pacific coast, (36) 2g kalmiopsis leachiana, (14) 3g lqhocarpus densiflorus, (280) 3g lonicer pileata, (13) 2g mahonia nervosa, (43) 2g mahonla repons, (1) 69 neviusia alabamensis, (53) 19 sidBleea campestris, (36) Ig tricyrtis tapei silk, (30) 2g vaccinkini ovaturn, (1,381) 1g s�esleria auturnnalis, (072) 1g seslefia caerulea and (140) 4" pots saxifrage umbrosa. Also includes many small changes in quantities - sizes listed on plant schedule for plants that stayed on the schedule. Changes the 2"-3" river rock maintenaric path. Less at exisitrig building, changes from crushed rock only at elect ullity vault and adds at vault by arribualrice driveway. IM 617,262.00 IM 617,262.0 1.00 64,500.00 1.00 $4,500.00 Deletes 470sf od landscape beds near existing utility vault: Includes irrigation, topsoil and mulch, -1.00 $1,117,00 1.05 -$1,172.85 Adds (3) 36" - 48"" sized boulders and (2) 28'-36" sized boulders at front entry. Priced as igneoous rock from Marenokos, 1.00 $4,1114,00 1.00 $4,114.00 Notes and Exclusions, Excludes all related work to the reclaimed wood arcs (snit, drian rock and wood). Excludes the sreen wall (fencing) Excludes the water feature Excludes benches It acceptable please sign below and issue change order. Subtotal: $24,703.15 Bonding: 0% $0.00 Authorized Signature 'A Date PROPOSAL I'OTAL: $24,703.0 12, rl H,"4 Lf, F1 MTV