Loading...
Response to PLN and BLDG.pdf1020 Bell St Edmonds, WA 98020 (425) 478-6057 1 o nne@)skoobi.com August 5, 2016 Linda Thornquist Senior Permit Coordinatori�, - City of Edmonds (425) 771-0220 ext. 1336 ischii t�9m�tt iniYt`�tW itaNk"i iitttf"Y.r,)NHNDS RE: 1024 Construction and Structural Engineering Review Dear Linda, In the two letters from Mike Clugston (10/29/2015) and Chuck Miller (12/7/2015), there were multiple items that needed to be addressed that both Mike and Chuck called out. This letter serves as the summary to those comments along with our responses. iv ormment Response Average Front Setback pending approval after Fee was paid and the front setback was approved pavment for application fee (Mike's Letter) Slope Considerations (Chuck's Letter) All details relating to the GeoTecluiical details are included in the responses to 1020 & 1024 combined development plan Structural Concerns (Chuck's Letter - Multiple Our Structural engineer and architect have made Pages) numerous updates to address the concerns called out by Chuck Miller. In Home Fixture Discrepancies between the Included an original copy of the application, along application and the house plans with an updated version of the application pages that matches the house plans. Warm o .g un°ais Arne Raquel Zm