Response to PLN and BLDG.pdf1020 Bell St Edmonds, WA 98020
(425) 478-6057 1 o nne@)skoobi.com
August 5, 2016
Linda Thornquist
Senior Permit Coordinatori�, -
City of Edmonds (425) 771-0220 ext. 1336 ischii t�9m�tt iniYt`�tW itaNk"i
iitttf"Y.r,)NHNDS
RE: 1024 Construction and Structural Engineering Review
Dear Linda,
In the two letters from Mike Clugston (10/29/2015) and Chuck Miller (12/7/2015), there were multiple
items that needed to be addressed that both Mike and Chuck called out. This letter serves as the summary
to those comments along with our responses.
iv ormment Response
Average Front Setback pending approval after Fee was paid and the front setback was approved
pavment for application fee (Mike's Letter)
Slope Considerations (Chuck's Letter) All details relating to the GeoTecluiical details are
included in the responses to 1020 & 1024
combined development plan
Structural Concerns (Chuck's Letter - Multiple Our Structural engineer and architect have made
Pages) numerous updates to address the concerns called
out by Chuck Miller.
In Home Fixture Discrepancies between the Included an original copy of the application, along
application and the house plans with an updated version of the application pages
that matches the house plans.
Warm o .g un°ais
Arne Raquel Zm