Loading...
Response to Trash Comments 1.pdfINII I F"`ESC l�ljWool ;. Y(nl!: 0 1, 9 IIG;;,w4 nrN rr ar¢ a �lAa i 11 1 ���,k�r' ��� � ��,, � �� 11�' City of Edmonds APR 2A; 2(J15 Development Services Department BtM DM �1�( �,.[,)II'aJt"1��1i",NR 7110 210ti� ST SW AlY Edmonds, WA 98026 Attn: Steve Fisher Public Works February 18, 2015 Re: Review Comment Response Dated 9/19/14, for Trash Collections Area BLD 20140914 GW Auto Rebuilt 2351.0 Highway 99, Edmonds, WA 1. The existing trash pickup location is at the South West end of the Existing Paint Shop (End of Building) where no enclosure exists. This location shall be relocated to the South West Corner of the new building, the containers will be located behind the Non -Combustible Steel Building with no Eve on the West Side of the new building. The containers will sit on a Concrete Pad 5' x 15' to prevent the wheels of the containers from sinking into the existing asphalt at that location. The South West end of the Building to the West Property Line will have an 8 Ft. High Cyclone Security Fence and Gate assembly with Privacy Slats to prevent people from going through the Trash and Recycle Containers and to visually keep the containers out of sight, as viewed from the South looking North. 2. Due to the fast elevation change at 1 to 1 the property to the West of our West property line looks over the top of our Building as viewed looking East. There also appears to be a Water Retention Pond with Forested area both sides of the Retentioned area, making it totally impossible for anyone to view the West walls of our Building. Therefore we request relief of the Standards for Garbage & Recycle collection, Enclosure & Access Policy for Design Standards for Commercial and Multi -Family properties. 3. It is agreed that GW Auto will roll the Containers out from behind the,gates to the area of stalls 28 & 29 on Trash and Recycle pickup days and put back the Containers to the approved Locations after containers are emptied. 4. We have met with Wes Smith (Operations Manager) from Republic Services, and have been provided with a letter of approval from Republic Services dated 1-23-15. Copy is attached for your records. Hopefully this information we have provided you with is acceptable for this project to move forward. Thank you, Henry Byam Wesco Construction Division ,Agent forJohn Redford, GW Auto,Rebuild WESCO GROUP CORPORATE HEADQUARTERS P.O. Box 5003 - Lynnwood, WA 98046 m 21601 - 66th Ave. W. A Mountlake Terrace, WA 98043 - (425) 771-0926 « Fax (425) 776-1917 January 23,2015 ToWhom bMay Concern: ������Pri��� A F �R = 2B1 !J | have examined the plans (P'1,revised 1/22/15) for the remodel atGVVAuto Rebuild, 23510Hwy 99, Edmonds WA. It will be adequate to safely access and service the garbage and recycle containers. Wes Smith Operations Manager Republic Services 2132566 1h Ave W Lynnwood, WA 98036 21325 -66th Avenue West Lynnwood, WA 98036-7327 425.646.24OUwFax 425.778.1148 vvwv«repoblicaurvicea.coou