Loading...
Response to Trash Comments 1.pdfw WARE MALCOMB architecture I planning I interiors I branding I civil March 28, 2017 Steve Fisher, Public Works City of Edmonds 121 5th Avenue N Edmonds, WA 98020 RE: Application #BLD20161520 Project Name: Edmonds Village Project Address: 22019 Highway 99 Dear Mr. Fisher, E y X 2'17 Ott - t N �DM N t Itemized below is our response to the review comments for the above referenced project. Our response appears in bold. TRASH DIVISION 1. The proposed site plan shows that the two trash enclosures are now relocated from the original previous plan. Both structures are still orientated ideally and have the required minimum width openings, along with the direct truck approach distance. Since the relocation actually affords bit more space than the original spots, the minimum depth of each enclosure needs to increase to 10' minimum, inside dimension. This allows for more maneuverability of stationary containers and a safer service scenario. Updated. 3015 112th Ave NE, Suite 205 Seattle, WA 98004 ph. 425.670.6706 1 f. 425.774.8219 www.waremalcomb.com