Loading...
Resub Cover Letter recd 6-11-18.pdfPLN20180025 RECE1,`V"*%- ry 546 PARADISE LANE JUN 11 21H Planning Department ADB Review Response �, tiEVELO COUNTC-RED Jit°>�-:. Comment letter of MAY 15, 2018 Response 6/11/18: 1. See new plot plan and landscape plans of 6/11/2018 2. See new key P 1 tope of sheet. 3. See new 15 foot setback at Building A 3b. See Key. All coverage calculated at all cantilevers and eves over 30". 3c. See changes in retaining wall with new set back and retaining walls following contours. 4. No exterior mechanical equipment proposed. 5. See Pedestrian Pathway on Landscape plan 6a. Porch lights and lights at garage doors 6b. See attached spec sheet and indication below plant schedule 7a. See P 1 For existing trees and sizes in green and one to remain 7b. See "IS" for irrigation system at west end of each building 7c. Fixed 7d. Cistus salvifolius is the yellow on plans at drive entry, entry to buildings and north sides of buildings. Fence is at south property line 7e. In order to provide access to three buildings driveways had to be provided at the south side of the buildings. Since the property to the West is steep ROW with many mature trees, this provides buffer to the west. A new fence will be provided at the south property line along with addition landscaping and existing trees to remain. An arbor will be provide per ECDC to enhance the fence with evergreen vines. 7f. Appropriate changes have been made the plans. 7g. Dumpster has been removed and the additional landscaping provided. Since the removal of the dumpster enclosure we were able to retain existing evergreen. 7h. Plans have been updated to meet ECDC 20.13.020.M 8a. See attached report 8b. See attached report 8c. Changes in retaining wall will not change report 8d. Report addendum to be provided at appropriate time when all changes identified. 9. See revised height calculations to match existing topo. 10. Two of the 3 items were approved and other items have sent to Karl. 11. See Sheet P2 for Jeanie requested items. See Sheet P1 for road widths. EUC in process and will be completed by Permit Submittal as indicated on the EUC form "rev. 10/1/13. EUC is not on the Design Review Application Checklist Thank you. Rob Michel 206-930-2445