Loading...
RESUB LETTER .docx Letter of Transmittal, Plan Check Corrections Re: Plan Check # BLD20160120, 0121 Project Name/Address: Lin, New SFR, 24025 &4 Ave. W. th Reviewer: JoAnne Zulauf, Engineering JoAnne, I have made all the corrections listed on your letter of June 7 regarding the various th site plan pages you requested for this project. The result is three totally new site plan pages, organized exactly the way you asked, and the addition of new details on the basement floor plan and electrical plan to provide for an ejector pump to deal with the effluent from the basement level bathroom and toilet room. The one thing on your list that I did not add was the notation about use of the existing sewer lateral , your item #10h of your list for the Stormwater/Utility Plan. This is because we have now had the existing lateral inspected, and have been informed by Public Works that we will not be allowed to hook up to it. They have approved our plan to hook up to the smaller sewer line up in 74 Ave W., which we th can do with a gravity system from the main level of the house, as demonstrated by the known elevations of the existing sewer line as depicted on our Plan. This will require use of an ejector pump for dealing with the basement drain likes as noted above. I have also included a schematic drawing of the ejector pump piping on the plans. I find it odd that even though the paved driveway crosses the property line to reach the paved street, your regulations would forbid the sheet flow dispersion from following the driveway all the way to the property line? This would be very counter-productive, but that is the way I have now shown it on the plans, per your note #18. Your revision request did not ask for a submittal letter to be submitted therewith, but Counter Staff have requested such, so here it is. Thank you, Ted L. Clifton Zero-Energy Plans LLC