Loading...
RESUB RECD 10-23-18.pdfMachuga, Jen From: Sidick, Susan <Susan.Sidick@pse.com> Sent: Tuesday, October 23, 2018 9:55 AM To: Edmonds Engineering Permits Subject: FW: ENG20180409 RE: 887035122-1240 8th Ave S Attachments: 20181023095531421.pdf; 20181023095538573.pdf Importance: High Hi Jen here is a clearer picture of the preinspect. Please ask for a rush on this job. Thank You Susan Sidick R 1660 Park Lane Burlington Wa 98233 Ce11425-457-6353 Office 360-766-5561 SR Permit Specialist From: Plaisance, Lorena Sent: Tuesday, October 23, 2018 9:54 AM To: Sidick, Susan Subject: RE: ENG20180409 RE: 887035122-1240 8th Ave S Sue ... I have attached a clearer copy of the preinspect along with my original permit request. I believe the issue is that your request called out for a c & c which is not the correct scope of work. PSE wants to pothole the gas main to determine if there is damage. From: Sidick, Susan Sent: Tuesday, October 23, 2018 9:07 AM To: Plaisance, Lorena Subject: FW: ENG20180409 RE: 887035122-1240 8th Ave S Gayle do you remember this one I was sending off to Edmonds for status did you send a better site plan? See attached of what was sent off to Edmonds From: Edmonds Engineering Permits[ma iIto: EngineeringPerm its@edmondswa.gov] Sent: Thursday, September 27, 2018 5:04 PM To: Sidick, Susan Subject: RE: ENG20180409 RE: 887035122-1240 8th Ave S Hello, The site plan we received seems to be missing some info., it is hard to determine what is proposed. The application proposed work list a cut and cap, though the site plan shows potholing over a lateral. Is there concern of a crossbore here? If so, the permit site plan and application are not consistent. Can you please provide us with a clean/legible (not that is horrible just think some info. May not have transferred over) site plan and application consistent with work shown on the plans. If I am misunderstanding, please get me informed. If you have any questions, feel free to contact me. Thank you, City of Edmonds, Engineering Division Permitting EngineerinqPerm its(cbedmondswa.aov Chris Rivera, Engineering Technician (425) 771-0220 ext. 1339 From: Edmonds Engineering Permits Sent: Monday, September 24, 2018 1:39 PM To: 'Sidick, Susan' <Susan.Sidick@pse.com> Subject: ENG20180409 RE: 887035122-1240 8th Ave S Hi Sue, I have entered your permit request (ENG20180409) and assigned it for review. Sincerely, Jen City of Edmonds, Engineering Division Permitting EngineerinqPermits@edmondswa.gov Jen Machuga, Permit Coordinator (425) 771-0220 ext. 1224 From: Sidick, Susan <Susan.Sidick@pse.com> Sent: Thursday, September 20, 2018 11:47 AM To: Edmonds Engineering Permits <EngineerinqPermits@edmondswa.gov> Subject: FW: 887035122-1240 8th Ave S Hi Here is cut and cap for 1240 8th AVE S. Thank You Susan Sidick R 1660 Park Lane Burlington Wa 98233 Cell 425-457-6353 Office 360-766-5561 SR Permit Specialist CAUTION: This email originated from outside of the organization. Exercise extra caution when responding, opening attachments, and clicking links. N PERMIT REQUEST FORM Date of Request: 09/19/18 Job number: 887035122 Job address: 1240 8th Ave S Project mgr: Gayle Plaisance PM email: gayle.plaisance@pse.com Estimated job start date: 09/28/18 Estimated job completion date: 10/26/18 Description of work to be performed: Pothole gas main @ 230'nnl Birch St R I0'micl R St Edmonds Zip: PM contact #: (253) 617-6013 Pavement cut? FYes FNo If yes, Dimensions of Cut: Length 3' Width 5' How many cuts? 1 Surface Type asphalt Require trenching? ❑Yes FNo If yes, Dimensions of trench: Length Width Method of installation: Traffic impact: Road closed ❑Yes F✓ No Lane closed Elyes Fv No How Many? Shoulder closed Oyes F,/� No Sidewalk closed FYes F�/ No Emergency Contact: Mike Blood Cell Number: (425) 864-6154 Depth Direction? South Job-#: 887035122 Date: o-3 - 1 -4- - 1 18 Jurisdiction: Edmonds Right of Way Permit? 2rYES n NO Est. Start Date: Est. Duration: I# , �Y� - •- Address: 1240 8th Ave 5 City / Zip: Edmonds Customer: 0 PM / Insp: CUST PHONE NUMBER PHONE NUM13ER WORK DE,9QRIPIION: T 1-1 kbG -4,� �,j K— V� & Construction Method L_ A -T Ea,A L Open Trench Ic " Trenchless ❑ PLAT MAP: 40 l SIP +k Work Location Siae of Cut Surface ivoa3 7_­ N of CL L ofT F42of & �'E O'C of CC­;A75_ -ST fffCLL ­CL _�a W - N S of CL &_ 'E W of CL FLAGGERS # MPH ❑ TROLLY LINES ❑ Bus STOP # F] METER HOODS # ❑ OFFICERS # SPEED LIMIT' F] TRAFFIC SIGNAL ❑ ARTERIAL E] NO PARKS # ❑ commercial ❑ Altered Commercial F] Leak Repair Service Information ❑ Template Bar [j Residential ❑ Altered Residential 0"RrWork Diameter Meter EFV E] Bollards 25' # n Mufti -Family E] Replacement Service Pothole Ej 5/8" 0 250 Ej 1800 E] Bollards4"# F1 New Constr. 0 Main Maintenance ❑ Extension El 11/8" n 425 n 2600 F1 Stub ❑ service maintenance [:] 11/4" ❑ 630 n 10,000 F] FUEL LINE PERMIT NEEDED 0 Extension ❑ valve maintenance E] 211 ❑ 1000 Fuel Line Length: n Compete Sery ❑ Cut & Cap Mtr Loc: Fuel Line Diameter: