Loading...
RESUB RECD 10-8-18.pdfN NORTH SITE PLAN (SHOWING OTHER UTILITIES IN THE AREA) LEGEND: O- WATER STORM DRAIN STORM DRAIN ACCESS RIGHT OF WAY EXISTING UG ELECTRIC CABLE PROP NEW UG ELEC CABLE IN CONDUIT GAS LINE SEWER LINE SANITARY SEWER ACCESS COMMUNICATIONS/CABLE POTHOLE LOCATION WHERE V VERTICAL SEPARATION BETWEEN UTILITIES WILL BE MAINTAINED NOTE: VACTOR TRUCK WILL BE USED FOR EXCAVATION TO MINIMIZE CHANCES OF HITTING OTHER UTILITIES ESPECIALLY ON CROSSINGS. NO PSE GAS ONSITE. HORIZONTAL SEPARATION WILL BE MAINTAINED AT 5'. Machuga, Jen From: Dumo, Richard <RSDumo@SNOPUD.com> Sent: Monday, October 8, 2018 6:54 AM To: Edmonds Engineering Permits Cc: Haskin, Beth; Maneri, Elaine; Nave, Moe; Zwar, Lynette Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Attachments: Village Estates Layout.pdf Chris, I have attached an updated Layout showing a greater than 5 feet of separation from the sewer line. Let me know if this works for you. Thank you. Richard Dumo / Snohomish County PUD No Distribution Engineering Services 1802 75th St. SW, Everett WA 98206 Office: 425-783-5110 From: Edmonds Engineering Permits [mailto:EngineeringPermits@edmondswa.gov] Sent: Friday, October 05, 2018 4:11 PM To: Dumo, Richard <RSDumo@SNOPUD.com> Cc: Haskin, Beth <BAHaskin@SNOPUD.com>; Maneri, Elaine <EMManeri@snopud.com>; Nave, Moe <MMNave@SNOPUD.com>; Zwar, Lynette <LKZwar@Snopud.com> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Richard, The city's request to have a minimum separation of 5' horizontal separation is just that (the minimum), if we can achieve more separation from sewer, water or storm than we would like to see that happen. Per the provided site plan, seems there is room to shift the proposed power line over to the east 3-4'. Can you please provide an updated site plan showing this alignment. If you have any questions, feel free to contact me. Thank you, City of Edmonds, Engineering Division Permitting EnaineerinoPermits@edmondswa.gov Chris Rivera, Engineering Technician (425) 771-0220 ext. 1339 From: Dumo, Richard <RSDumo@SNOPUD.com> Sent: Wednesday, September 26, 2018 7:57 AM To: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Cc: Haskin, Beth <BAHaskin@SNOPUD.com>; Maneri, Elaine <EMManeri@snopud.com>; Nave, Moe <MMNave@SNOPUD.com>; Zwar, Lynette <LKZwar@Snopud.com> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Hi Chris, I have attached essentially the same layout that I sent you before. It was drawn according to what was located onsite. (Pictures below) This is the best drawing I can do. I really want to meet with you onsite to show exactly what separation we have to work with in this busy area. Please let me know when you are available today. (Below highlights the 5 feet separation that we have to maintain between the sewer) Thank you Chris. EDGE OF ROW (NO SIDEWALK) A-10826 A-10825 1� 0 A-10826: tYl•-�'i C., - :!r`. Y .. -I '^...i �r -�1 •.� -•:� f r ��r � ,I't:� ai'�- -t��' �►�. � ��• � � 'l'�i.a' rr1�.iy,. � �.��Xt�rr,•:+ . A..•:�Y,j 1{.: -. �. ��_ ��.�+��fr v�lvj� y���,'�'�}^'•.,�� - .y:.t. •trj'�v •mil } J �' • I K-_`•fl '�%��.. `"`r [•`{ _ _+�'.R ay �. a �� +r=I'��'•• X �. �,� •'✓y .�• 1 f< .�+ T, �• 'QI�T `yY �'i. �.v• �►t l � �.. _ `..: •. ��••. • �!".!�►{ � • .. Y •� Jf)'w�`�j�r�7'♦p�1 Lr .r`�' A r.Y►►.'• ♦.• ♦ p� �4� - •` � `�•"<"+C � j: n''lw.T .�:��: it F!�"+•'':7.3:4SN'•r': , �•��. Y: 4'r l��i.`'�'fT'�t's._. ''���"17�1;`'�i.L!�"t�+ V i 9 V -T. I oc ES: d ...ems Richard Dumo / Snohomish County PUD No. 1 Distribution Engineering Services 1802 751h St. SW, Everett WA 98206 Office: 425-783-5110 is • C J • T1% From: Edmonds Engineering Permits[mailto:EngineeringPermits@edmondswa.gov] Sent: Tuesday, September 25, 2018 4:27 PM To: Dumo, Richard <RSDumo@SNOPUD.com> Cc: Haskin, Beth <BAHaskin@SNOPUD.com>; Maneri, Elaine <EMManeri@snopud.com>; Nave, Moe <MMNave@SNOPUD.com>; Zwar, Lynette <LKZwar@Snopud.com>; Joint Use <JointUse@SNOPUD.com> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Richard, I stopped by the site and yes there is a lot happening underground in that cul-de-sac. Can we please get an updated site plan that accounts for all utilities within the right of way. As you did previously, please show that separation can be meet between the proposed power line route and the city's storm system as well as separation from Olympic View Water & Sewer Districts (OVWSD) sewer and water mains. If you have any questions, feel free to contact me. Thank you, City of Edmonds, Engineering Division Permitting EnaineerinaPerm its@edmondswa.aov 9 Chris Rivera, Engineering Technician (425) 771-0220 ext. 1339 From: Dumo, Richard <RSDumo@SNOPUD.com> Sent: Monday, September 17, 2018 1:29 PM To: Rivera, Chris <Chris.Rivera @edmondswa.gov> Cc: Haskin, Beth <BAHaskin@SNOPUD.com>; Maneri, Elaine <EMManeri@snopud.com>; Nave, Moe <MMNave@SNOPUD.com>; Zwar, Lynette <LKZwar@Snopud.com>; Machuga, Jen <Jen.Machuga@edmondswa.gov> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Hi Chris, The locates that I ordered at Village Estates were finally done. I have attached a site plan that shows the other utilities in the area. This should satisfy your request on the previous email. Please let me know if you have questions so we can schedule a meeting on site to discuss while the paint on the ground are still fresh. Thank you. Richard Dumo / Snohomish County PUD No. Distribution Engineering Services 1802 75th St. SW, Everett WA 98206 Office: 425-783-5110 From: Rivera, Chris[mailto:Chris.Rivera@edmondswa.gov] Sent: Tuesday, September 04, 2018 3:10 PM To: Zwar, Lynette <LKZwar@Snopud.com>; Dumo, Richard <RSDumo@SNOPUD.com> Cc: Joint Use <JointUse@SNOPUD.com>; Machuga, Jen <Jen.Mach uga@edmondswa.gov> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) CAUTION: THIS EMAIL IS FROM AN EXTERNAL SENDER. Do not click on links or open attachments if the sender is unknown or the email is suspect. Hello, The proposed was reviewed with the city utilities engineer and it looks like the city's storm main and its appurtenances are not shown. The preferred route would be to maintain power outside of the traveled road similar to that of the existing. Can you please provide the city with an updated site plan that shows all city and Olympic View Water & Sewer District (OVWSD) utilities and that the required 5' horizontal and 1' Vertical separation can be achieved. Please show any substantial vegetation within the route that might pose a problem as well. If you have any questions, feel free to contact me. Thank you, Chris B. Rivera Engineering Technician City of Edmonds 121 5t" Ave. N. Edmonds, WA 98020 425.771.0220 ext. 1339 From: Machuga, Jen Sent: Tuesday, August 21, 2018 11:53 AM To: 'Zwar, Lynette' <LKZwar@Snopud.com> Cc: Wayland, Christina <Christina.Wayland@edmondswa.gov>; Rivera, Chris <Chris. Rivera@ ed mondswa.gov>; 'Joint Use' <JointUse@SNOPU D.com>; 'RSDumo@SNOPUD.com'<RSDumo@SNOPUD.com> Subject: RE: Edmonds ROW App - WO 100027591 (ENG20180372) Hi Lynette, I have entered your permit request (ENG20180372) and referred it to Chris for review. Thanks, Jen Jen Machuga, Permit Coordinator City of Edmonds, Engineering Division 121 - 5th Avenue North Edmonds, WA 98020 (425) 771-0220 ext. 1224 Jen. Machuga@edmondswa.gov Permit Center Hours: Monday & Tuesday 8:00 AM - 4:30 PM Wednesday 8:30 AM - Noon Thursday & Friday 8:00 AM - 4:30 PM From: Wayland, Christina Sent: Tuesday, August 21, 2018 8:36 AM To: Machuga, Jen <Jen.Mach uga@edmondswa.gov> Subject: FW: Edmonds ROW App - WO 100027591 From: Zwar, Lynette <LKZwar@Snopud.com> Sent: Monday, August 20, 2018 8:11 AM To: Wayland, Christina <Christina.Wayland@edmondswa.gov>; Rivera, Chris <Chris.Rivera @edmondswa.gov> Cc: Dumo, Richard <RSDumo@SNOPUD.com>; Joint Use <JointUse@SNOPUD.com> Subject: Edmonds ROW App - WO 100027591 Good Morning, Please see the attached permit application for WO 100027591 and let us know if you have any questions. Thanks, Lynette Zwar Joint Use & Permit Coordinator Public Utility District No. 1 of Snohomish County 425-783-5610 425-267-6163fax LKZwar6a�snopud.com