Loading...
Resub recd 5-15-17.pdfResponse to request for information from March 17. 2017 MAY 15 2017 DEVELOPMENT SEmv` ;b May 12 2017 COUNTER 1a. — c. were answered by filing a critical areas checklist with the city and paying the fees. 2. Revised drawings with larger and more clear information and dimensions have been supplied. 3. The proposed ADU living space as measured from the interior line of the outside walls will be 800 sq. ft. or less. 4. The fence along the property line occluding the view to the entry door of the ADU will not have any opening. The approach to the entry door will be from the driveway on an east / west direction along the south end of the ADU. 5. Noted. We will be acquiring that data. 6. Parking The 5 parking spaces and turn around areas are now clearly shown and labeled on the new drawings. The drawings also more clearly delineate the paved areas on the property. Stormwater: The proposed ADU project as drawn including all new and replaced impervious surfacing comprises no more than 1400 sq. ft. This calculation was made by using the ADU footprint, the footprint of the new parking and sidewalk on the south side and the replacement of existing_ driveway that will require over digging and replacement to set footings and pour an apron away from the new construction on that side. I 3 0 1 a